background image

Page 5

Page 5

3. INSTALL SIDE RAILS AND SHELTERLOCK

 STABILIzER BLOCKS:

A. Place assembled first end rib in the staked area. Place the 

ShelterLock

 on the upright as shown in Detail D. From the 

outside of the rib insert the bolt through the upright and then 

through the ShelterLock

.

B. Place the plain end of the side rail over the bolt and nest 

it into the ShelterLock

. Install the nut onto the bolt and 

tighten. Repeat these steps for the opposite side and all of 

the remaining ribs. The side rails for the last rib will have two 

plain ends.

4. INSTALL WIND BRACES:

A. Attach wind brace between the end rib and the first 

middle rib as shown in Detail E. Bolts attached at the 

cross rails should be inserted facing inside the shelter.

5. INSTALL TOP RAIL:

A. Place the first top rail under each 

end rib and secure it 

with a bolt as shown in Detail F. The same cross rail should 

lay on top of the all middle ribs. Secure the rails to the frame 

with the hardware indicated in Detail F. The top rail attached 

to the last rib will be installed under the pipe.

detail d

detail e

detail F

FirSt 

middle 

rib

wind braCe

end rib

00669

10210

install the top rail

Over all middle ribs

Under First and last ribs

Fig. 2

800260

1010

10135

10135

00670

02030

02030

02030

02030

05-10DT13-0A

Summary of Contents for Peak Style 8' W x 8' H

Page 1: ...uctions 8 W x 8 H or 10 H Peak Style Frame Assembly Before you start 2 individuals recommended for assembly approximate time 3 hours Recommended tools Power Drill Safety Glasses Rope Tape Measure Ratc...

Page 2: ...48 1 2 X1 163 Plain endS 2 H CrOSS rail 50 1 2 X1 163 1 SwdG 2 HOle CrOSS rail Plain end 47 X1 1 8 dia CrOSS rail Plain endS 45 3 4 l 2 HOleS CrOSS rail SwedGed 48 7 8 X1 1 8 dia baSe FOOt 1 3 8 Stee...

Page 3: ...OSS rail 50 1 2 X1 163 1 SwdG 2 HOle CrOSS rail Plain end 47 X1 1 8 dia CrOSS rail Plain endS 45 3 4 l 2 HOleS CrOSS rail SwedGed 48 7 8 X1 1 8 dia baSe FOOt 1 3 8 Steel Gry 3 way tOP COnneCtOr 3 way...

Page 4: ...termined by the size shelter you purchased Tie a rope diagonally from corner to corner B Measure across area end to opposite end See Detail A The measurement A and B should be equal 8 8 A B LENGTH OF...

Page 5: ...n ends 4 Install Wind Braces A Attach wind brace between the end rib and the first middle rib as shown in Detail E Bolts attached at the cross rails should be inserted facing inside the shelter 5 Inst...

Page 6: ...from the top bend and place the webbing in between The top rail should pass through the loop of the webbing Reconnect top rail onto rib and secure it with the screws indicated See Detail I C Remove t...

Page 7: ...pocket slot at the first middle rib from the front and the first middle rib from the rear Some of the pipe will be exposed For long buildings it may be necessary to use additional pipes in the middle...

Page 8: ...3 way and 4 way clamps as shown in Detail P Check that the rails are evenly spaced 8 above the ground on both sides Push down on the cover rails and connectors one at a time to tighten the bolted clam...

Reviews: