31 |
P a g e
OPERATION
Note:
From a cold start, the incubator requires 8 hours to come up to and stabilize at temperature
and humidity levels prior to loading samples. Stabilization safeguards samples.
P
UT THE
I
NCUBATOR INTO
O
PERATION
Perform the procedures below after the unit has been installed in a new workplace location. These
prepare the incubator for normal use.
1.
2.
Attach the power cord that came with the unit to the power
inlet receptacle on the side of the incubator.
Plug the power cord into the workspace electrical supply outlet.
3.
Turn on the incubator.
•
Place the incubator
Power Switch
in the ON ( I )
position.
4.
5.
procedure on page
34. Set the incubator to your incubation application temperature.
6.
procedure on page 36.
7.
procedure on page 37. Set the
CO
2
setpoint to your application gas concentration.