background image

2

E

Provide  an  opening  in  the  wall  or  cabinet  as  indicated  in 
Figure 1. The depth should be a minimum of 20-1/8". If the 
Depth (E) dimension is greater than 21", the outlet location 
may be in any area on the rear wall. The floor of the opening 
should be constructed of plywood strong enough to support 
the weight of the oven (approximately 100 lbs.) and should 
be level for proper operation of the oven.

NOTE:

  While  the  proper  function  of  the  oven  does  not 

require  that  the  opening  be  enclosed  (with  sides,  ceiling 
and rear partition), this may be required by local code, and 
it is suggested that the local code be checked for any such 
requirement.
The  opening  in  the  wall  or  cabinet  must  be  within  the 
following dimensions, centered horizontal to the cabinet.

RK-94S27

RK-94S30

A

20"

20"

B

26-7/8"

29-7/8"

C

18-1/2"

18-1/2"

25-1/4"

25-1/4"

E

Min. 20-1/8"

Min. 20-1/8"

F

5"

5"

G

10"

10"

A. Insert the edge of DUCT (B) into the hold lip of DUCT (C). 

Secure together by using a SCREW (I) provided in the kit. 
See Figure 2.

DUCT (C)

DUCT (B)

SCREW (I)

Figure 2

B. Position  DUCT  (A)-1  on  the  top  of  the  oven  inserting 

edge of DUCT (BC) assembly into hole lip of DUCT (A)-1. 
Tighten two SCREWS (I), securing DUCT (A)-1 to DUCT 
(BC) assembly. See Figure 3.

SCREW (I)

DUCT (A)-1

DUCT (BC)

SCREW (I)

Figure 3

Outlet  should 

NOT

  be  in  the  shaded  area  as  indicated  on 

Figure 1.

NOTE

•  If the dimension of DEPTH (E) is more than 21", the outlet 

location may be any area on the rear wall.

D

C

34-1/2” MIN.

FLOOR

FLOOR

A

B

G

F

E

STEP 1

CABINET OR WALL OPENING

STEP 2

EXHAUST DUCT ASSEMBLY

C. Position  DUCT  (A)-2  on  the  top  of  the  oven  and  insert  it 

into the hold lip of DUCT (A)-1. Secure DUCT (A)-2 to DUCT 
(A)-1 using two SCREWS (I) provided.  See Figure 4.

SCREW (I)

SCREW (I)

DUCT (A)-2

DUCT (A)-1

D. Position DUCT (A)-3 on top of the oven and insert it into 

DUCT (A)-2. Secure DUCT (A)-3 using three SCREWS (I) 
provided. See Figure 5.

SCREW (I)

SCREW (I)

SCREW (I)

DUCT (A)-3

DUCT (A)-2

NOTE:

 Floor of opening 

should be 90˚ to front 
cabinet frame.

Figure 1

Figure 4

Figure 5

Summary of Contents for RK-94S27

Page 1: ...sel turntable from the oven cavity Because the kit includes metal parts due caution should be used in handling and installation to avoid the possibility of injury INSTALLATION INSTRUCTIONS ITEM PART NAME QTY A DUCT A 1 PDUC 0259WRW0 1 B DUCT A 2 PDUC B127MRP0 1 C DUCT A 3 PDUC A734WRW0 1 D DUCT B PDUC 0260WRW0 1 E DUCT C PDUC A274WRW0 1 F BOTTOM DUCT ASSEMBLY FDUC B099MRK1A 1 G M3 9 16MM PAN HEAD ...

Page 2: ...edge of DUCT B into the hold lip of DUCT C Secure together by using a SCREW I provided in the kit See Figure 2 DUCT C DUCT B SCREW I Figure 2 B Position DUCT A 1 on the top of the oven inserting edge of DUCT BC assembly into hole lip of DUCT A 1 Tighten two SCREWS I securing DUCT A 1 to DUCT BC assembly See Figure 3 SCREW I DUCT A 1 DUCT BC SCREW I Figure 3 Outlet should NOT be in the shaded area ...

Page 3: ... Figure 5B SCREW SCREW Figure 5B A BOTTOM DUCT ASSEMBLY Place the Bottom duct in the center of the opening so that gap A is equal to gap B When the Bottom Duct assembly is positioned properly the front edge of the duct will be flush with the front of the cabinet Secure with 2 SCREWS H See Figure 6 GAP A NOTE CENTER BOTTOM DUCT ASSEMBLY IN THE OPENING DETAIL A GAP B BOTTOM DUCT ASSEMBLY SCREW H Fig...

Page 4: ...re fitted into the holes of the Bottom Duct Assembly See Figure 8 DUCT RECESS BOTTOM DUCT ASSEMBLY FOOT Figure 8 D BACK FRAME INSTALLATION Position back frame equal space top to bottom side to side Mark for 4 holes center punch and pre drill with 1 16 drill bit Secure frame with 4 SCREWS G See Figure 9 EQUAL GAP TOP BOTTOM EQUAL GAP SIDE TO SIDE MOUNTING HOLES MOUNTING HOLES MOUNTING HOLES MOUNTIN...

Reviews: