R- 308JK
R - 308JS
R-308JW
R-309JW
13
TEST PROCEDURES
PROCEDURE
LETTER
COMPONENT TEST
switch. The meter should indicate an open circuit with the door open and a closed circuit with the door closed.
If improper operation is indicated, replace the secondary interlock switch.
5. Reconnect all leads removed from components during testing.
6. Reinstall the outer case (cabinet).
7. Reconnect the power supply cord after the outer case is installed.
8. Run the oven and check all functions.
PRIMARY INTERLOCK SYSTEM TEST
DOOR SENSING SWITCH
1. Disconnect the power supply cord, and then remove outer case.
2. Open the door and block it open.
3. Discharge high voltage capacitor.
4. Isolate the switch and connect the ohmmeter to the common (COM.) and normally open (NO) terminal of the
switch. The meter should indicate an open circuit with the door open and a closed circuit with the door closed.
If improper operation is indicated, replace the door sensing switch.
5. Reconnect all leads removed from components during testing.
6. Reinstall the outer case (cabinet).
7. Reconnect the power supply cord after the outer case is installed.
8. Run the oven and check all functions.
NOTE: If the door sensing switch contacts fail in the open position and the door is closed, the cooling
fan, turntable and oven light will be activated by RY1.
PRIMARY INTERLOCK RELAY (RY2)
1. Disconnect the power supply cord, and then remove outer case.
2. Open the door and block it open.
3. Discharge high voltage capacitor.
4. Disconnect two (2) wire leads from the male tab terminals of the Primary Interlock Relay. Check the state
of the relay contacts using a ohmmeter. The relay contacts should be open. If the relay contacts are closed,
replace the circuit board entirely or the relay itself.
5. Reconnect all leads removed from components during testing.
6. Reinstall the outer case (cabinet).
7. Reconnect the power supply cord after the outer case is installed.
8. Run the oven and check all functions.
G
MONITOR SWITCH TEST
1. Disconnect the power supply cord, and then remove outer case.
2. Open the door and block it open.
3. Discharge high voltage capacitor.
4. Before performing this test, make sure that the secondary interlock switch and the primary interlock relay are
operating properly, according to the above Switch Test Procedure. Disconnect the wire lead from the monitor
switch (COM) terminal. Check the monitor switch operation by using the ohmmeter as follows. When the door
is open, the meter should indicate a closed circuit. When the monitor switch actuator is pushed by a screw
driver through the lower latch hole on the front plate of the oven cavity with the door opened (in this condition
the plunger of the monitor switch is pushed in), the meter should indicate an open circuit. If improper operation
is indicated, the switch may be defective. After testing the monitor switch, reconnect the wire lead to the
monitor switch (COM) terminal and
check the continuity of the monitor circuit.
5. Reconnect all leads removed from
components during testing.
6. Reinstall the outer case (cabinet).
7. Reconnect the power supply cord after
the outer case is installed.
8. Run the oven and check all functions.
Monitor
Switch
Secondary
Interlock Switch
Screw Driver
Ohmmeter
BLK
GRY
WHT
H
BLOWN C/T FUSE TEST
1. Disconnect the power supply cord, and then remove outer case.
2. Open the door and block it open.