15
R-2110JK
R-2110JW
R-2120JK
R-2120JW
TEST PROCEDURES
PROCEDURE
LETTER
COMPONENT TEST
4. Isolate the switch and connect the ohmmeter to the common (COM.) and normally open (NO) terminal
of the switch. The meter should indicate an open circuit with the door open and a closed circuit with
the door closed. If improper operation is indicated, replace the stop switch.
5. Reconnect all leads removed from components during testing.
6. Reinstall the outer case (cabinet).
7. Reconnect the power supply cord after the outer case is installed.
8. Run the oven and check all functions.
NOTE: If the stop switch contacts fail in the open position and the door is closed, the cooling fan motor,
stirrer motor and oven light will be activated by RY1.
1. Disconnect the power supply cord, and then remove outer case.
2. Open the door and block it open.
3. To discharge high voltage capacitor, wait for 60 seconds.
4. Before performing this test, make sure that the secondary interlock switch and the primary interlock
switch are operating properly, according to the above Switch Test Procedure. Disconnect the wire
lead from the monitor switch (COM) terminal. Check the monitor switch operation by using the
ohmmeter as follows. When the door is open, the meter should indicate a closed circuit. When the
monitor switch actuator is pushed by a screw driver through the lower latch hole on the front plate of
the oven cavity with the door opened (in this condition the plunger of the monitor switch is pushed in),
the meter should indicate an open circuit. If improper operation is indicated, the switch may be
defective. After testing the monitor switch, reconnect the wire lead to the monitor switch (COM)
terminal and check the continuity of the monitor circuit.
5. Reconnect all leads removed from
components during testing.
6. Reinstall the outer case (cabinet).
7. Reconnect the power supply cord
after the outer case is installed.
8. Run the oven and check all
functions.
F
MONITOR SWITCH TEST
1. Disconnect the power supply cord, and then remove outer case.
2. Open the door and block it open.
3. To discharge high voltage capacitor, wait for 60 seconds.
4. If the monitor fuse is blown when the door is opened, check the primary interlock switch, secondary
interlock switch and monitor switch according to the "TEST PROCEDURE" for those switches before
replacing the blown monitor fuse.
CAUTION: BEFORE REPLACING A BLOWN MONITOR FUSE, TEST THE PRIMARY INTERLOCK
SWITCH, SECONDARY INTERLOCK SWITCH AND MONITOR SWITCH FOR PROPER
OPERATION.
If the monitor fuse is blown by improper switch operation, the monitor fuse and monitor switch must
be replaced with "monitor fuse and monitor switch assembly" part number FFS-BA016/KIT, even if
the monitor switch operates normally. The monitor fuse and monitor switch assembly is comprised
of a 20 ampere fuse and switch.
5. Reconnect all leads removed from components during testing.
6. Re-install the outer case (cabinet).
7. Reconnect the power supply cord after the outer case is installed.
8. Run the oven and check all functions.
G
BLOWN MONITOR FUSE TEST
Secondary
Interlock
Switch
Monitor
Switch
Screw Driver
Ohmmeter
Black