![Sharp MX-PEX1 Installation Manual Download Page 7](http://html.mh-extra.com/html/sharp/mx-pex1/mx-pex1_installation-manual_367303007.webp)
MX-PEX2 Installation in MX-5500N/6200N/7000N 3 – 2
3. Install of the I/F unit
1)
Remove the three screws of the MFP cnt PWB. Install the I/F
unit (package part No.1) with the three screws that was
detached from MFP cnt PWB.
* When installing the I/F unit, use an extreme care to make
the sheet metal not come in contact with the MFP cnt PWB.
4. Installation of the control box
1)
Insert the control box until the connectable position for HDD-
IDE cable, connect the HDD-IDE cable.
2)
Insert the control box until the position that fix the HDD-IDE
cable to the clamp, put the HDD-IDE cable to the sheet (A),
and fix it to the clamp.
* Check that the HDD-IDE cable is not twisting, hanging
down, etc.
3)
Push the control box into the main unit. Lay the finger handle.
Fix with the screws.
4)
Cut out the cut-out portion of the right rear cabinet.
5)
Push into the cable to the right cabinet rear cover, and attach
it. At this time, check that the pawls are properly fitted to the
main unit.
1
2
3
1
2
1
A
2
3
1
2
2
3
3
2
4
5
2
3
1