11
INSPECTION AFTER ASSEMBLING
On completion of assembling, the following should be inspected.
1. Verifi cation of operations
1.1 Is there any part left uninstalled (magnet plate, in particular) ?
1.2 Is there any wrong wiring ?
1.3 Is the body engaged securely with the upper ring and bottom cover ?
1.4 Are screws tightened fi
rmly
?
2. Measurement of insulation resistance
2.1
Measure the insulation resistance by a 500V d.c. insulation resistance meter and be sure that
resistance in at least 1 M
Ω.
(Check it before and just after the performance test.)
2.2 Be sure that the unit can stand against a 1000V a.c. high voltage for one minute. (Check it just
after the performance test.)
3. Boiling and warming capacity
3.1 Fill the pot full of water (up to the full-water level) and boil it. Be sure that hot water temperature
is more than 90
o
C.
3.2 After boiling, the “WARM” lamp should light up instead of the “BOIL” lamp.
3.3 Approximate one hour after boiling, be sure that the hot water temperature still stays at 80
o
C or more.
4. Water discharge capacity
After checking the boiling-warming capacity, keep the hot water quantity at its discharge level and
make sure that the hot water is discharged by 150 ml in average when the push button is pressed.
(Water discharge in average = ________________________________ )
If the hot water quantity is insuffi cient, recheck that the bellow packing-B, inner lid packing, etc.
Due to the troubleshooting guide.
Total water discharge
Number times of pressing the button
Summary of Contents for KP-19S
Page 5: ...5 CIRCUIT DIAGRAM WIRING DIAGRAM ...
Page 20: ...20 ...