(1) Start the vacuum pump. (Do not stop the vacuum pump until the evacuation of Step 13 is not completed.)
(2) At first open the additional valve of gauge manifold, and then open the low pressure valve and high pressure valve.
(At this time install the solenoid valve opening magnet if available.)
(3) Evacuate for 5 minutes.
(4) After evacuating for 5 minutes close the additional valve and high pressure valve of gauge manifold, and then open
the low pressure valve.
(5) Open the liquid side valve of charging cylinder to enter the coolant (about 30 g) into the cycle from the gauge manifold.
At this time the low pressure gauge pressure must be about 3 to 4 kgf/cm
2
G.
(6) Close the liquid side valve of charging cylinder and the high pressure valve of gauge manifold (close all the valves).
To power source
on
off
1
2
3
4
Socket (for vacuum pump)
Start of vacuum pump
Check valve for
vacuum pump
Vacuum pump
for R-12
Valve opening
Valve opening
Valve opening
Low
pressuer
High
pressuer
Gauge manifold
Low pressure pipe side
High pressure pipe side
Dehumidifier
Refrigeration cycle
Valve closing
Valve closing
Liquid side
Gas side
Charging cylinder
for HFC-134a
«
«
2
3
4
5
6
8
on
off
Check valve for
vacuum pump
Vacuum pump
for R-12
Valve closing
Valve closing
Valve closing
Valve closing
Valve closing
Low
pressuer
High
pressuer
Valve opening
Valve opening (charge about 30 g of coolant into
refrigeration Cycle.)
Gauge manifold
Low pressure pipe side
High pressure pipe side
Refrigeration cycle
Liquid side
Gas side
Charging cylinder
for HFC-134a
Summary of Contents for DW-71-H
Page 17: ...17 DW 71 H CIRCUIT DIAGRAM AND EXPLANATION OF OPERATION Circuit diagram ...
Page 18: ...18 DW 71 H ...
Page 20: ...20 DW 71 H 3 Location of PWB parts 1 Power supply PWB Parts side 2 Operation PWB Parts side ...
Page 38: ...38 DW 71 H ...
Page 39: ...39 DW 71 H ...
Page 40: ...40 DW 71 H 96 SHARP CORP YU0 10E Printed in Japan ...