DV-550U
6-3
(2) Remove the M2.6 screw C .
(3) Holding aslant upward the mechanism chassis moving chassis assembly D in the arrow direction, remove.
Note: The slide rack E must be moved to the left side as shown in diagram.
Take care so that the lead wires, especially the earth sponge G at the pickup FPC F front end, must not be
removed.
5. Disassembling the loading drive system
(1) Remove the two M2 screws A .
(4)
Relay gear 2 E .
(2) Remove the tray pinion B .
(5)
Remove the two M1.7 screws F .
(3) Remove the relay gear 1 C together with the
(6)
Remove the L motor G (with pulley) downward.
timing belt S D .
M2
M1.7
L·Motor Pulley
L·Motor
Timing belt S
Relay
gear1
Relay
gear2
Tray pinion
A
B
E
C
D
G
F
Insulator
Insulator
Insulator
Insulator
Mechanism chassis
P tight screw with
M2.6 washer
C
B
A
B
C
6. Disassembling the mechanism chassis from the moving chassis
(1) Remove the M2.6 screw A .
(2) Remove the insulator B (2 pcs. at the right side in diagram) parallel in the arrow direction.
(At this time it is better to insert the fine head of screw driver at the ID side of insulator and to move in the arrow
direction, which facilitates removal.)
(3) Remove the mechanism chassis in the arrow direction, pulling upward aslant.
At this time take care so that the insulator C (left side, 2 pcs.) is not damaged. (Do not put at once the mechanism
chassis assembly.)
Slide rack
Mechanism chassis moving
chassis assembly
P tight screw with
M2.6 washer
G
C
F
E
D
Summary of Contents for DV-550U
Page 5: ...DV 550U 4 1 For details on the use of each control 4 PART NAMES 14 Remote Sensor ...
Page 6: ...DV 550U 4 2 ...
Page 52: ...DV 550U ...
Page 53: ...A B C D E F G H 1 2 3 4 5 6 7 8 9 10 11 12 DV 550U DV 550U 14 1 14 2 14 BLOCK DIAGRAM ...
Page 56: ...U DV 550U 10 11 12 13 14 15 16 17 16 2 ...
Page 58: ...10 11 12 13 14 15 16 17 U DV 550U 16 4 ...
Page 83: ...Ref No Part No Description Code Ref No Part No Description Code 18 19 DV 550U ...