Time Study
Unit disassembly = 20 minutes.
Front glass panel and front cab removal = 10 minutes.
Panel disassembly / separation = 10 minutes.
Harness inspection = 5 minutes.
LED swap test 5 minutes each. Can be up to 20 minutes for all 4 LED
strips. (10 minute average)
Install new LED assembly = 5 minutes.
Re-assemble entire set = 40 minutes.
Total process time = 1hour 40 minutes
3