28/07/2020
VACUUM-LEAK DETECTOR
VLXE .. Ex M and VLXE .. Ex MMV
- 33 -
(6) If the vacuum build-up is too slow, an assembly pump can be at-
tached to the connection on three-way valve 20.
Turn valve 180° and switch on the assembly pump.
(7) After the operating vacuum of the leak detector has been
reached (pump in leak detector shuts off), turn three-way valve
20 180°, switch off the assembly pump, and remove it.
(8) Turn three-way valve 21 180° and remove the pressure measur-
ing gauge.
(9) Perform a functional check according to Section 7.3.
21
20
21
20
Commissioning
Summary of Contents for VLXE Ex M Series
Page 49: ...28 07 2020 VACUUM LEAK DETECTOR VLXE Ex M and VLXE Ex MMV 49 12 7 Ex approval Appendix ...
Page 50: ...VACUUM LEAK DETECTOR VLXE Ex M and VLXE Ex MMV 28 07 2020 50 Appendix ...
Page 51: ...28 07 2020 VACUUM LEAK DETECTOR VLXE Ex M and VLXE Ex MMV 51 Appendix ...
Page 52: ...VACUUM LEAK DETECTOR VLXE Ex M and VLXE Ex MMV 28 07 2020 52 Appendix ...
Page 54: ...VACUUM LEAK DETECTOR VLXE Ex M and VLXE Ex MMV 28 07 2020 54 Appendix ...