
Overpressure/Vacuum pump ÜVP/VP 218
22/01/2019
- 6 -
4. Maintenance
Before you perform any maintenance work, switch off the overpressure/
vacuum pump.
According to §15 BetrSichV a plant in need of monitoring is only to be
started after it has been subjected to a test before startup. Furthermore,
recurring inspections according to §16 BetrSichV have to be performed.
Such tests shall be carried out by an approved monitoring body or a
qualified person. For more details see BetrSichV.
Maintenance