
22/01/2019
Overpressure/Vacuum pump ÜVP/VP 218
- 5 -
3. Use of the overpressure/vacuum pump
3.1 Installation
Check whether the mains voltage matches the voltage specified on the
CE marking.
The overpressure/vacuum pump is equipped with a type CEE 7 plug
connector. If necessary, have it replaced by specialist staff.
Always check whether the on/off switch is in the 0/OFF position before
you connect the plug connector (fig. 1).
3.2 Switching on
Plug in the plug connector and start the device with the on-off switch.
Always and exclusively use the switch (set to "OFF") to stop the over-
pressure/vacuum pump.
Use of the overpressure/vacuum pump