OVERPRESSURE – LEAK DETECTOR DL ..
Contents
Page
1 Subject
2
Field of application
2.1 Requirements for interstitial space
2
2.2
Tanks / interstitial space
2
2.3 Stored
products
2
2.4 Exclusion
3
3
Description of functions
3
3.1 Switching and pressure values
3
3.2 Normal
operation
3
3.3
Air or liquid leak
4
3.4
Air drying / Dry filter (DL.. ONLY)
4
3.5 Overpressure
valve
4
3.6
Description of the display and control elements
4
4 Installation
instructions
6
4.1 General
6
4.2
Personal protective equipment
7
4.3
Installation of the leak detector
7
4.4
Installation of the connection lines
7
4.5
Installation of the dry filter (DL.. ONLY)
8
4.6
Choice of pressure reducer (DLG.. ONLY)
8
4.7
Pressure cylinder and pressure reducer (DLG.. ONLY)
8
4.8 Electrical
connection
9
4.9 Installation
examples
9
5 Start
up/servicing
9
6 Operating
instructions
10
6.1 General
10
6.2 Maintenance
11
6.3 Intended
use
11
6.4 Function
test
11
6.5 Alarms
14
7 Removal
14
8 Marking
15
9 Abbreviations
15
DRAWINGS
Setting three-way valves
P – 060 000
Installation example DL ..
M1 + M2 – 060 000
Installation example DLG ..
M3 + M4 – 065 000
Wiring diagram DL ..
SL - 853 600
Wiring diagram DLG ..
SL – 853 700
Test device
P - 115 392
ANNEX:
B
Switching and pressure values
B – 1
TD Technical data
TD – 1
26/01/2006
1
4 von 49
Summary of Contents for DL 100
Page 20: ...Ex Ex Ex 17 102 72 73 43 13 27 11 2002 M1 060 000 76 30 21 20 70 20 von 49 ...
Page 21: ...Ex Ex Ex 73 73 73 230 V 50 Hz 21 02 43 20 13 72 27 11 2002 M2 060 000 71 69 01 09 21 von 49 ...
Page 26: ...22 84 85 85 22 52 98 98 0 Kl 1 0 17 12 2002 P 115 392 21 21 20 20 90 90 26 von 49 ...
Page 34: ...28 06 2005 Drilling Dimension 200 300 260 220 T 140 8 34 von 49 ...