
SFS / Installation manual Soter
5
➋
Mark on the termination where
the wire ends. This shows where
the hollow part of the termination
ends, and where the first crimp
will be located.
➎
Mark on the termination where
the wire ends. This shows where
the hollow part of the termination
ends, and where the first crimp
will be located. This needs to
be done on all terminations-
tensioners and toggle fork ends.
➌
Repeat step 2 on all terminations-
tensioners and toggle fork ends.
Re-insert the wire fully ensuring
the wire is fully engaged in the
termination up to the point marked.
➏
Re-insert the wire fully ensuring
the wire is fully engaged in the
termination up to the point marked.
➍
Take the crimping tool and set the
barrel to ‘close’. Position the central
section of the die so that the first
crimp is made next to the line
marked on the termination itself.
➊
Pull the wire though the whole system and through all posts.
Before any accurate measurement can be made, the
wire must first be loosely pulled from the start of the system, through every component fitted to posts to the end point.
Step 2
Wire measure & wire crimp
➐
As you reach the start of the line,
you will have manually pulled the
wire enough so that it doesn’t
touch the roof surface, and has
reasonable tension in it.