SFS Soter Installation Manual Download Page 5

SFS / Installation manual Soter

5

  Mark on the termination where 

the wire ends. This shows where 
the hollow part of the termination 
ends, and where the first crimp 
will be located. 

  Mark on the termination where 

the wire ends. This shows where 
the hollow part of the termination 
ends, and where the first crimp 
will be located. This needs to 
be done on all terminations- 
tensioners and toggle fork ends.

  Repeat step 2 on all terminations- 

tensioners and toggle fork ends. 
Re-insert the wire fully ensuring 
the wire is fully engaged in the 
termination up to the point marked.

  Re-insert the wire fully ensuring 

the wire is fully engaged in the 
termination up to the point marked.

  Take the crimping tool and set the 

barrel to ‘close’. Position the central 
section of the die so that the first 
crimp is made next to the line 
marked on the termination itself.

  

Pull the wire though the whole system and through all posts. 

Before any accurate measurement can be made, the 

wire must first be loosely pulled from the start of the system, through every component fitted to posts to the end point.

Step 2  

Wire measure & wire crimp

  As you reach the start of the line, 

you will have manually pulled the 
wire enough so that it doesn’t 
touch the roof surface, and has 
reasonable tension in it.

Summary of Contents for Soter

Page 1: ...Soter fall protection and wire system Installation manual...

Page 2: ...oter HL Start End post with female M10 Universal B Soter R Intermediate post with intermediate bracket C Soter HL Corner with corner kit solid corner D Soter anti pendullum swing post Work Restraint W...

Page 3: ...ers the more load each corner post must support in two directions which can cause post lean Please refer to guidelines adjacent however this should be assessed at the installers discretion on site For...

Page 4: ...the fixing length supplied With all 8 fixings installed turn S2 can onto female boss in base plate by hand firstly then to the desired tightness by hand or with the help of a tool Anchor installation...

Page 5: ...termination up to the point marked Re insert the wire fully ensuring the wire is fully engaged in the termination up to the point marked Take the crimping tool and set the barrel to close Position the...

Page 6: ...lity to check each straight line span has enough tension in it and the tension is evenly distributed throughout the system The nuts on the tensioner can now be tightened against the turnbuckle locking...

Page 7: ...E Requirements for the user to use the system safely correctly n No of persons the system is designed for n Maximum lanyard length imperative in work restraint systems n Installation date n Recertific...

Page 8: ...T T20 4 5 x 80 Fastener Range Type Material T carbon steel Drive Diameter d in mm Length l in mm Fastener Range Type Material T carbon steel Drive Diameter d in mm Length l in mm WFR T T30 6 x 50 WFR...

Reviews: