SFS / Installation manual Soter
Use 8 no. PA Sleeve’s and TI Screws for concrete / Using 8 no. PA sleeves and BS screws
for 18mm Ply /OSB Board or 0.7mm Metal deck or tongue and groove deck
➊
Ascertain location of base plate
picking up the crown or trough
of the deck based on the fixing
length supplied.
➍
With all 8 fixings installed turn
S2 can onto female boss in base
plate by hand firstly then to the
desired tightness by hand or with
the help of a tool.
➎
Anchor installation is complete
and is ready for Soter
components to be secured.
➋
Insert the sleeves
➌
Take drill fitted with extended drive
bar and T25 Torx bit and fix all 8 no.
fasteners through tubes, insulation
build up and deck, securing firmly.
DO NOT OVERDRIVE.
Step 1
Anchor installation