
RRGA-SVX01A-EN
7
General
Information
Furnished with the AllVac are:
• Two -10-ft. and 20-ft. 3/4” hoses equipped with four 3/4” female flare
fittings with isolation valves
• Two - 3/4”-5/8” flare reducing fittings
• Two - 5/8” -1/2” flare reducing fittings
• Two - 3/4” female flare unions
• 50-ft., 230/460-VAC power cord
• 100-ft., 120-VAC power cord
• Two - 3/4” female flare 0.73-liter disposable in-line filter driers
Please follow the recommended procedures outlined in this manual for
regular changing of compressor fluid. Before every recovery job install
new liquid and vapor drier cores.
Peak Performance:
To get the highest performance from your AllVac unit, we recommend that
you:
1. Connect to 3/4” evaporator and condenser ports on the chiller or A/C sys-
tem and to recovery cylinders with 3/4” full ports whenever possible and
with a minimum 3/4” liquid dip tube.
2. Whenever there is an additional liquid access port on the A/C system,
connect an additional refrigerant line (3/4” if possible) directly from the
A/C system, through a drier, to the recovery cylinder. AllVac’s pressure
differential will motivate the refrigerant to the recovery cylinder, increasing
recovery speed. See Notes 1, 2, & 3 or 4 & 5 in Operating Procedures.