
ALLVAC COMMERCIAL RECOVERY UNIT
RECOVERY UNIT HAS POWER (PRESS START)
CHILLER VAPOR RECOVERY FINISHED!
(PRESS ENTER)
VAPOR RECOVERY IN PROCESS CHILLER - - PSI
RECOVERY CYLINDER - - PSI
USE
MV
TO SELECT SCALE OR FLOAT SWITCH
SCALE SELECTED
CLOSE BOTH SERVICE ACCESS VALVES
ON CHILLER, (PRESS ENTER)
USE
MV
TO SELECT OPERATING VOLTAGE SINGLE
PHASE 230V (THEN PRESS ENTER)
VAPOR RECOVERY 2 MINUTE
WAIT STATE0:00
CLOSE BOTH HAND VALVES ON ALLVAC
UNIT CHILLER SIDE, (PRESS ENTER)
LIQUID REFRIGERANT CLEARING IN PROCESS
0:00
CLOSE BOTH LIQUID & VAPOR HAND VALVES ON
RECOVERY TANK, (PRESS ENTER)
HOSE EVACUATION IN PROCESS
0:00
CLOSE BOTH LIQUID & VAPOR TANK HAND VALVES
ON ALLVAC UNIT, (PRESS ENTER)
CHILLER RECOVERY COMPLETED!
DISCONNECT ALL HOSES AND POWER
YOU SELECTED SINGLE PHASE 230V OPERATION
IS THIS CORRECT? (ENTER = YES, CANC = NO)
SELECT REFRIGERANT WITH
MV
KEYS
R ___(PRESS ENTER)
SELECTED REFRIGERANT R ___
IS THIS CORRECT? (ENTER = YES, CANC = NO)
USE
MV
TO SELECT 0 PSI OR 28 HG SHUTDOWN
0 PSI SELECTED
CONNECT ALL REFRIGERANT HOSES
(PRESS ENTER)
OPEN CHILLER CONDENSER & EVAPORATOR
HAND
VALVES ON ALLVAC UNIT, (PRESS ENTER)
OPEN TANK VAPOR & LIQUID HAND VALVES ON
ALLVAC RECOVERY UNIT, (PRESS ENTER)
TO EVACUATE HOSES PRESS ENTER
TO SKIP HOSE EVACUATION PRESS CANCEL
OPEN CHILLER CONDENSER & EVAPORATOR
SERVICE ACCESS VALVES, (PRESS ENTER)
OPEN VAPOR & LIQUID HAND VALVES ON
RECOVERY TANK, (PRESS ENTER)
CHANGING VALVE SEQUENCE, LIQUID TRANSFER
90 SECOND WAIT 1:30
LIQUID TRANSFER! CHILLER PRESSURE - - PSI
IN PROCESS RECOVERY CYLINDER- - HG
CHANGING VALVE SEQUENCE, VAPOR TRANSFER
90 SECOND WAIT 1:30
DISPLAY SEQUENCE
RRGA-SVX-01A
25