![Serai MT/BZERO Manual Download Page 8](http://html.mh-extra.com/html/serai/mt-bzero/mt-bzero_manual_1245741008.webp)
To connect the operator to the control unit proceed as follows:
01.
Remove the lid of the operator as shown in pic.6.
02.
Loosen the cable gland, pass the cable through it, screw its 3 wires to the terminal blocks, then tighten the gland.
03.
Replace the lid on the operator.
To check the connections, the direction of rotation of the operator, the delay between the movements of the 2 leafs and to
program the gate main positions, refer to the instructions manual of the control unit.
6
DAL
1965
8
5
-
ELECTRICAL CONNECTIONS
5
A -
CONNECTING THE OPERATOR TO THE AUTOMATION CONTROL UNIT
Summary of Contents for MT/BZERO
Page 11: ...NOTES DAL 1965 11 ...