34
Sentry Equipment Corp
8.
Set the voltage source to read 0 V. Verify voltage source using a digital multimeter.
Input 0 V. Press the Enter key to begin calibrating.
9.
The controller is done calibrating the 0 V when the Offset value stops adjusting
and the input value on the screen changes from 0 V to 2.5 V. Input 2.5 V for selected
channel. Press the Enter key.
10.
The controller is done calibrating the 2.5 V when the Gain value stops adjusting.
Remove voltage from channel. Press the Enter screen to go to the channel selection
screen.
11.
Repeat steps 8-11 for remaining channels requiring 0-2.5 V calibrations.
12.
After calibration of all channels has been completed, use the ESC key to return to the
Operation Screen.
Flow Meter Calibration
Consult Factory for assistance.
Summary of Contents for Sample Sentry II High Pressure
Page 7: ...Sentry Sample Sentry II 7 Figure 1 Typical P ID of a Sample Sentry II System...
Page 8: ...8 Sentry Equipment Corp Figure 2 P ID of a Sample Sentry II system with Secondary Cooling...
Page 11: ...Sentry Sample Sentry II 11 Figure 3 Controller Front Panel...
Page 24: ...24 Sentry Equipment Corp Figure 25 General Arrangement High Pressure Model...
Page 26: ...26 Sentry Equipment Corp Figure 26 Electrical Wiring Diagram...
Page 43: ...Sentry Sample Sentry II 43 This page is intentionally left blank...
Page 44: ...44 Sentry Equipment Corp This page is intentionally left blank...