background image

Pre-cut Wall

Stdu

Frame Window Opening

Frame Door Opening

Refer to door manufactures
instructions for installation details

40" window

Cripplers

27" Header

36" Header

Supports

27" Sill

Rough Opening Details for Window and Door

a"2( '$$2&8*#(0 1"2 *,62/ 6'** 9/'&2$ .,) 6#** (223 1, 32+#32 6"2/2 .,) 6'(1
1, *,+'12 1"2 2(1/. 3,,/ '(3 1"2 @\e E bCe 6#(3,6 $)--*#23 #( ,)/ L#14 !"2 321'#*$
82*,6 $",6 ",6 1, 9/'&2[#( 1"2 /,)0" ,-2(#(0$4

If you add additional windows,

follow the manufacturer's instructions for the rough opening size.

B4

<2*2+1 ' 6'** $1)3 6"2/2 .,) 6'(1 1, $1'/1

%#($1'**#(0%1"2%6#(3,6%,-2(#(04%=($1'**
'(,1"2/%6'**%$1)3%$-'+23%@]e%'6'.4

@4

P,+'12 J\K 9,)/ \Ae *,(0 @E\$ 9/,& ,)/ L#14

?)1%,(2%1,%'%%*2(01"%,9%%@]e4

b4

=($1'**%1"2$2%@E\$%'$%$",6(%,(%/#0"14

\4

?)1%J@K%\Ae%*,(0%@E\$%1,%bCe4%=($1'**%'$

"2'32/%$)--,/1$%'(3%'%-/2[8)#*1%"2'32/4

_4

?)1%*291,F2/%@E\$%#(1,%8*,+L$%'(3%#($1'**

1"2%8*,+L$%'8,F2%1"2%"2'32/4

*

G'#(1'#(%BCe%$1)3%$-'+#(0%$,%1"2

$#3#(0%6#**%&221%1"2%$1)34

*

Pre-cut Wall

Stud

80-1/2" Header

Supports

Pre-built 37-1/2"

Door Header

B4

<2*2+1 ' 6'** $1)3 6"2/2 .,) 6'(1 1, $1'/1

#($1'**#(0%1"2%3,,/%,-2(#(04%=($1'**%'
'(,1"2/%6'**%$1)3%$-'+23%b][B^@e%'6'.4

@4

?)1 J@K 16, -/2[+)1 6'** $1)3$ 1, ' *2(01"

,9%HA[B^@4

b4

=($1'**%1"2$2%$1)3$%'$%"2'32/%$)--,/1$4

\4

=($1'** ' b][B^@e *,(0 -/2[8)#*1 3,,/ "2'32/

,F2/%1"2%$)--,/1$%$1)3$4

_4

?)1%@E\%8*,+L$%'(3%#($1'**%8*,+L$%'8,F2

1"2%"2'32/4

*

Pre-cut Wall

Stdu

27" Between

Studs

Summary of Contents for Jefferson 16x20 Building

Page 1: ...0 1 6 7 1 1 82 237 6 2 17 6 1 1 2 1 9 2 3 3 0 12 7 4 0 1 A A Assembly Book Manufactured by Reynolds Building Systems Inc 205 Arlington Drive Greenville PA 16125 Sentry Buildings BCDE AD 3 0 the Jeffer...

Page 2: ...2 6 2 L23 1 2 1 9 DWD 214 2 1 2 12 1 2 21 6 1 82 23 1 1 2 9 1 9 6 3 91 9 2 21234 S 0 82 9 1 2 9 1 9 6 3 91 9 7 2E12 3 07 91 9 0 3 9 2 1 0 6 82 32 F2 23 8 2 4 6 82 2 12 32 F2 3 6 82 1 9 23 829 2 1 1 32...

Page 3: ...F2 S N 1 3 82 1 2 123 EC 23 BCe 2 12 3 F2 23 6 1 b e 1 0 2 3 0 F2 6 3 9 04 Foundation TypesV a 1 9 3 1 82 1 32 2 3 6 1 1 2 9 12 6 82 1 234 2 8 3 0 32 2 6 3212 2 6 1 1 2 9 9 3 1 82 234 W 926 3 992 2 1...

Page 4: ...ions for the rough opening size B4 2 2 1 6 1 3 6 2 2 6 1 1 1 1 1 0 1 2 6 3 6 2 04 1 1 2 6 1 3 23 e 6 4 4 P 12 J K 9 Ae 0 E 9 L 14 1 2 1 2 01 9 e4 b4 1 1 2 2 E 6 0 14 4 1 J K Ae 0 E 1 bCe4 1 2 32 1 3 2...

Page 5: ...24 Treated Bottom Plate B4 1 J K 16 E HD J 2 6 82 1 2 123K 1 2 01 9 f B e4 Q 1 1 2 8 3 1 021 2 3 3 12 6 1 DgD L 6 2 2 1 2 6 1 3 6 82 1234 4 G L D D 6 2 2 821622 9 1 16 1 3 L 4 292 2 23 12 12 4 Note Wh...

Page 6: ...1 8 1 32 9 2 Y 9 2 6 1 8 3 1 1 2 2 12 9 1 2 EH 8 3 4 d 1 021 2 0 BA3 123 L2 4 5 2 JB K 162 F2 23 2F2 2 324 2x8 Boards 48 OSB Filler V V V V V V GLUE 2x8 Boards 4 1 J K 2F2 2 1 6 1 3 821622 1 2 1 3 8 1...

Page 7: ...6 1 3 6 82 1234 Step 4 Assemble 2 Two 12 Side Wall Frames 144 Top Wall Plate 144 Treated Bottom Plate 16 15 1 4 16 4 1 JBAK 12 2 1 6 1 3 821622 1 2 1 3 8 11 12 4 d 1 2 1 2 123 8 11 12 1 2 6 1 3 6 1 J...

Page 8: ...02 3 2 9 1 1 3212 2 1 2 2 0 1 9 1 2 0 2 04 1 J K 16 2 1 1 3 1 1 2 0 1 2 B B e 3 1 1 2 2 32 1 0 JBAK 12 BA3 L2 4 1 1 2 EH 2 32 8 1 2 0 1 2 2 3 1 1 2 3N 2 1 1 3 6 1 BA3 L2 4 4 1 J_K 9 F2 2 2 9 2 1 1 3...

Page 9: ...locking 2x8 Door Header Pre cut 2x4 Studs 2x4 15 5 Treated Bottom Plate 108 Door Opening Width X X X X X X X X S S 111 Door Header 2x4 Header Support Studs 4 W 2 8 2 1 2 9 1 6 9 2 0 1 2 6 12 1 8 F2 3...

Page 10: ...2 1 2 f B e 2 6 9 2 1 1 2 2 6 9 24 d 1 2 2 6 9 2 1 021 2 6 2 2 1 2 8 11 6 1 JHK 2 0 1 BA3 L2 J 1 002 2 32 9 1 2 1 3 K 4 b4 1 2 9 1 2 B D 0 9 2 2E1 1 1 2 HD 32 6 9 24 2 2 6 1 BA3 L2 4 92 1 2 End Wall F...

Page 11: ...all Frames continued 15 5 Front Wall Frame _4 1 1 2 9 1 6 9 2 821622 1 2 32 6 9 2 4 2 2 9 2 1 021 2 1 1 2 2 0 J K 9 BA3 L2 4 C4 d 9 2 1 1 2 9 0 BC3 T F4 7 9 2 2 1 0 2 2 1 87 212 8 1 Jnot includedK 23...

Page 12: ...4 2 2 1 1 1 BCD 0 E 1 2 12 1 2 12 9 1 6 4 Step 8A Install Siding on Wall Frames 8 Long 2x4 Tie Plate Exterior Siding Information b4 1 E B D 8 3 1 2 32 6 9 24 2 E 32 6 1 2 12 6 8 11 0 1 1 2 BCD 0 1 2 1...

Page 13: ...9 6 1 1 2 E 1 2 8 L 6 4 1 J K 9 2 3 0 2 4 9 2 2 1 1 2 9 6 1 E 9 1 6 45 2 H3 0 F4 8 E 23 He 14 4 1 3 0 2 1 2 8 L 6 6 1 1 2 DPWQD 2302 9 6 1 1 2 3 0 1 2 32 6 4 1 b 2 2 4 LAP Edge Side Wall Back Wall Ins...

Page 14: ...Step 12 Install Stairs Steps not needed with this size and model Step 9 thru 11 IMPORTANT Go now to the instructions in the stair kit book to install the stairs floor joist and flooring...

Page 15: ...e it easier to stand the gable upright over the lower wall 2x4 Block 2x4 Block 71 3 8 Long Truss Leg 2x4 On Edge 97 1 2 Long 2x4 On edge 188 1 2 71 3 8 Long Truss Leg 81 3 4 Long Truss Top Truss Knee...

Page 16: ...9 2 1 E 12 0 B e 26 4 2 2 1 2 HA B e 1 3 1 1 2 2 8 1 9 2 0 B e 26 4 Step 13B Assemble Rear Gable continued C4 1 _ He 3 C B e 6 1 3 1 2 291 32 9 1 2 0 8 2 9 24 5 2 M 2 1 2 2 1 2 1 3 2 84 d 1 E 8 11 12...

Page 17: ...6 1 1 2 3 0 1 2 32 6 4 5 2 H3 0 F4 23 B e 14 1x4 Trim b4 1 J K 16 fCe 0 BE 1 8 3 821622 2 8 3 4 3 82 9 6 1 1 2 91 9 4 1 3 8 3 1 9 14 4 2 2 1 1 1 1 1 1 2 9 1 6 2 4 Siding Filler 4 1 HA B e 0 3 0 2 4 1...

Page 18: ...8 E 4 Siding Extends Over Trim Paint edge Step 16 Install Rear Roof Gable 4 2 1 1 2 0 8 2 8 L 6 4 2 1 3 2 2 0 8 2 3 0 2E12 3 F2 1 8 L 6 4 2 12 0 8 2 6 1 8 11 E 2E12 3 0 B B e 1 62 6 E 8 1 32 4 d 1 9...

Page 19: ...04 P 12 JbK 1 22 b e 0 E 4 1 JBK 2 1 bCe4 Q 1 1 2 2 8 3 6 82 64 G2 2 3 1 2 1 8 11 0 8 2 9 2 3 1 JbK 1 22 E 1 1 2 01 3 1 32 bCe 8 34 1 E 6 1 BA3 L2 4 36 Step 17 Assemble Install Front Gable B4 1 JbK 1...

Page 20: ...8 2 1 4 5 2 3 L2 0 6 2 2 1 3 2 1234 b4 1 3 8 2 EC 99 1 8 L 32 1 2 0 8 2 2 1 2 2 4 1 1 2 2 8 L 9 6 1 1 2 9 2 9 1 2 0 8 2 3 04 1x3 Stripping 2x6 Soffit Block 2x6 Truss Plate 4 1 99 1 8 L 32 2 DgD 1 2 1...

Page 21: ...1 2 e 6 324 302 0 21 bB b e 6 324 W 6 3 0 2 6 1 8 821622 1 2 0 21 3 1 2 EC 8 3 4 2 2 0 21 6 1 JbK 1 22 6 9 C3 23 Ce 14 Importanti 6 2 1 0 1 2 0 21 1 1 2 L 227 1 0 21 6 1 1 2 12 1 0 23 32 1 6 3 1 2 302...

Page 22: ...4 1 1 2 1 99 1 2 9 6 1 1 2 2 3 9 1 2 3 8 2 99 1 8 L4 b4 1 99 1 2 1 2 12 6 4 B4 1 EC 02 F2 1 2 DgD L 1 2 1 12 3 9 6 1 1 32 2302 9 EC4 5 2 B B e N 1 02 4 21 1 20 1 02 4 5 2 BA3 123 L2 1 2 2 1 2 1 1 1 2...

Page 23: ...2 1 9 1 82 1622 1 2 1 99 1 2 3 1 2 2 L4 _4 1 99 1 2 1 9 1 9 6 1 1 2 8 11 E 4 8 Soffit Panels 8 Soffit Panel b4 1 J K 16 He 6 32 E H b e 99 1 2 32 1 2 E 6 1 23 32 3 6 3 1 2 DPWQD 2302 1 021 2 1 1 2 L...

Page 24: ...hing Last Sheathing packed in Pallets Plyclip Install this Row Second 4 1 1 0 1 0 8 2 L 22 1 9 2 1 0 1 1 2 9 1 9 1 2 8 3 07 refer to the sheathing layout below4 5 0 1 0 1 2302 1 1 2 9 1 221 8 6 1 1 2...

Page 25: ...9 2 1 0 1 2 2 0 8 24 5 2 B B e 1 26 1 2 2 1 2 99 1 2 1 1 2 E 4 5 2 3 L2 1 2 2 1 2 9 2 1 0 1 1 2 E 4 4 2 1 3 2 2 H _ He 0 E 821622 1 2 99 1 2 3 1 2 9 2 1 0 1 2 32 9 1 2 0 8 24 2x4x81 3 4 2x4x82 5 8 2x...

Page 26: ...32 9 1 2 0 8 27 9 6 1 1 2 9 2 1 04 Blue Ends Together Step 25B Install Front Gable Trim continued 82 1 4 long 1x6 Trim 82 1 4 long 1x6 Trim Step 26 Install 1x6 Door Jamb B4 1 BAD 0 BEC 8 3 1 2 01 3 1...

Page 27: ...1 E 2 32 3 1 2 1 9 3 2 04 2 2 1 1 3 6 1 BA3 L2 4 1x6 Door Jamb 2x4 Cut to Fit 1x6 Door Jamb Step 28 Install 2x4s Around Door Jamb 4 1 BE BAD 1 8 3 3 1 1 2 3 2 07 2 12 23 1 2 1 9 1 2 32 3 1 4 1x4 Door...

Page 28: ...1 2 6 3 6 4 4 2 1 6 3 6 2 04 O 3 1 2 6 3 6 2 0 926 H3 0 F4 4 b4 11 BEb 1 8 3 0 2 32 9 1 2 6 3 67 9 6 1 1 2 1 9 24 2 BEb 32 1 6 2E12 3 b B e 82 6 1 2 6 3 6 9 2 1 2 2 F2 1 2 8 11 1 4 2 1 1 6 2 1 1 2 32...

Page 29: ...B B e O 02 d B_A B _ He 1 2 99 1 26 6 8 1 B _ B e a 3 26 B _ be a 3 26 BH EC k 1 O 02 H EBA k 1 O 02 A BCe Q 9 9 2 1 0 BC Z4 11 2 a 3 T 2 B BC Z4 L Qty Material Shipped by Local Supplier H E Q 2 1 a 1...

Page 30: ...2 O 0 a 3 6 bCe E bCe B 0 2 O 0 a 3 6 He E bHe 23 Q 2 112 B e E be B 1 0 1 302 h 22 B e Y T 8 2 S 2 k2992 BCD a 32 E AD 3 0 h 1 Q L 0 P 1 Qty Material Shipped on B Pallet C 3 EC E HB b e T 8 2 YF2 0...

Reviews: