Safety Precautions and Working
Techniques
Warning
• Do not lend or rent your power drill without the respective owner manual and this installation manual. Be sure that
anyone using your power drill understands the information contained in the relevant manuals.
Warning
• When using an electric power drill and a generator as a power source in the field, hold the power tool by insulated
gripping surface when drilling where the auger may contact buried wiring. Contact with a “live” wire will make exposed
metal parts of the tool “live” and shock the operator. Ensure that the cord does not get wrapped around the spinning
auger.
Warning
• Always wear certified safety protection. Wear ear and eye protection when operating power drills.
Warning
• To reduce the risk of injury, the operator should wear proper protective apparel. Clothing must be snug-fitting, but
allow complete freedom of movement. Avoid loose fitting jackets, flared or cuffed pants or anything that could be
drawn into the boring tool. Wear overalls or long pants to protect your legs. Do not wear shorts. Use gloves when
handling the power drill.
Warning
• Always use the side handle supplied with the tool. Keep a firm grip on the tool at all times. Do not attempt to operate
this tool without holding it with both hands. Operating this tool with one hand will result in loss of control when striking
hard pans or stones.
Summary of Contents for Drill & Drop
Page 1: ...Drill Drop Installation Manual Version 6 0 Published 2021 Drill Drop Done ...
Page 14: ...Installation Equipment Required ...
Page 20: ...6 Do Not Use a Battery Operated Drill for Heavy Soils which is lower than 40v ...
Page 22: ...Recommended Installation Heavy Soil Type Example ...
Page 24: ...2 Prepare Screw Pins for Drilling Insert the Screw Pins ...
Page 32: ...10 Removal of Screw Pins Use the drill in reverse mode to unscrew the pins ...
Page 39: ...Augering Guidelines for the Drill Drop Bluetooth Probe ...
Page 42: ...3 Good Install Good Install Aerial fully exposed above ground All sensor buried in the soil ...
Page 44: ...5 Augering Guidelines for good Installs ...
Page 47: ...Installation in Mounded Rows ...
Page 52: ...5 Extension Foot Height Adjustment Re tighten the nut and bolt circled ...
Page 53: ...6 Tripod Levelling Use a levelling bubble to position the tripod correctly ...
Page 56: ...Advanced Installations Duplex Soils ...
Page 59: ...3 Finish the Job With the Tapered Auger ...
Page 60: ...Continue with Step 6 of the Augering Process ...
Page 61: ...Advanced Installations Subsurface ...
Page 81: ...Drill Drop Probe Extraction Mk1 ...
Page 82: ...1 Probe Extraction Tools Wooden Blocks Spade Trowel Crowbar Chain Extraction Tool ...
Page 91: ...10 Probe Extraction Gently remove the Drill Drop Probe when it becomes free of the soil ...
Page 93: ...Drill Drop Probe Extraction Mk2 ...
Page 98: ...4 Use of Rubber Mallet Use rubber mallet to remove Extraction Tool from Drill Drop Probe ...