Sensus LonWorks TP/FT-10 User Manual Download Page 4

User Manual 
LonWorks TP/FT-10 
Option module for PolluStat

 

 

M H 6144 INT, page 4 

3.4. Service LED and Service Button functionality 

The placement of the Service LED and Service Button (called also Service Pin) is shown on the picture 
below. 

 

        Picture 3: Service Button and Service LED placement on the LonWorks option module 
 

Standard Service LED signalization is described on the picture below. If other, please contact technical 
support

 

     Picture 4: Service LED signalization

 

 
Short press of the Service Button send to the network Service message. 
Press longer than 15 seconds to reset the Update Rate parameter to default value 10 minutes. 

3.5. Firmware Update 

The option module firmware update can be done by user. Downloading the firmware to device is performed 
by dedicated software run on Microsoft Windows operating system or by using the option Load application 
image and attach an Image file path to the Echelon OpenLNS Commissioning Tool during 
the module commissioning process (option Commission… when you right-click on the device shape). 
The newest Application Image File for the option module in distribute on demand after request with the serial 
numbers of devices to which they relate only. In case of any question, please contact technical support.

 

= OFF 

ON

 

= OFF or ON 

CONFIGURED

 

UNCONFIGURED

 

WINK

 

Time [sec] 

Service LED 

Service Button 

Summary of Contents for LonWorks TP/FT-10

Page 1: ... between Network and Option Module 277 VRMS 0 60 Hz Number of LonWorks Devices per Segment Up to 64 Power down Network Protection High impedance when module is unpowered 1 3 Environmental requirements Operating Temperature ambient 5 to 50 C Storage Temperature 10 to 65 C Operating and Storage Humidity 25 to 90 RH 50 C non condensing 2 Safety instructions The installation electrical connection and ...

Page 2: ...onal pulse input or output 51 2nd additional pulse input or output In Out2 Volume output on TEST mode 52 GND for 1st additional pulse input or output 53 1st additional pulse input or output In Out1 Energy output on TEST mode LonWorks module clamp no Description 60 12 24 V AC DC SELV power supply 61 12 24 V AC DC SELV power supply 96 LonWorks TP FT 10 channel interface 97 LonWorks TP FT 10 channel ...

Page 3: ... 2700 3 Use only the dedicated terminators one terminator in free topology and two terminators on both ends of network channel in bus topology In case of any question please contact technical support 3 3 Integration in the LonWorks network It is recommended that the process of integration of the LonWorks option module setting the logical address and state of device as Configured and Online or defi...

Page 4: ... to reset the Update Rate parameter to default value 10 minutes 3 5 Firmware Update The option module firmware update can be done by user Downloading the firmware to device is performed by dedicated software run on Microsoft Windows operating system or by using the option Load application image and attach an Image file path to the Echelon OpenLNS Commissioning Tool during the module commissioning ...

Page 5: ...flow_f IEEE754 l s Flow Rate Fixed nvoFlowRateP SNVT_flow_p Int16 m3 h Forward temperature nvoForwardTemp SNVT_reg_val_ts Int32 C Forward temperature Float nvoForwardTempF SNVT_temp_f IEEE754 C Forward temperature Fixed nvoForwardTempP SNVT_temp_p Int16 C Return temperature nvoReturnTemp SNVT_reg_val_ts Int32 C Return temperature Float nvoReturnTempF SNVT_temp_f IEEE754 C Return temperature Fixed ...

Page 6: ...rror 0000 Hardware status flag Er02 bit2 Hardware status flag Er02 8000 Hardware status flag Er03 bit3 Hardware status flag Er03 8000 End of battery life time bit4 End of battery life time 1000 Hardware status flag Er05 bit5 Hardware status flag Er05 0008 Hardware status flag Er06 bit6 Hardware status flag Er06 0008 Flow sensor is empty Air in the ultrasonic flow sensor bit10 Flow sensor is empty ...

Page 7: ...nd left side Put the option module into the designated contact sockets The contact pins must not be bent Mount the fixing screws Install the additional battery into the second battery holder and plug in the connector to the second battery connector Route the connecting cable through an available cable fitting and make a pull relief Then connect the wires to the respective terminals Close the lid a...

Page 8: ...All trademarks are the property of their respective owners Edition 001 1503 030 0002 01A Subject to changes without notice Sensus GmbH Ludwigshafen Industriestraße 16 D 67063 Ludwigshafen Phone 49 0 621 6904 1000 Certified according to ISO 9001 Fax 49 0 621 6904 1409 Quality Management System Quality Austria Reg no 3496 0 E Mail info int xyleminc com www sensus com ...

Reviews: