Initialize
System
ON
Power
Status
USB
Status
Docking
Status
Status
MGT Docking Station version II
5. Main Operation Procedure
•
Docking Station On
When the device is on, the power LED will turn from
orange
to
green
.
•
Calibration or Bump Test
To initiate the calibration or bump test, press the button. And, the power LED will turn
orange
. The device will decide if the configuration will be loaded on the MGT based on if the
configuration check box is marked or not.
•
When the device enters the test procedure, the light will turn
green
and the unit LED will
turn blue as the following procedures.
- Unit 1 LED : Check if the device is connected
- Unit 2 LED : Initiate Air Pump
- Unit 3 LED : Initiate Bump or Calibration
- Unit 4 LED : Initiate Air Pump
- Unit 5 LED : Save Log events
•
To cancel the test, press the button one time.
•
When the test is completed successfully, the all unit LED will turn
blue
and when the unit fails,
the third LED(
blue
) will flash.
•
To communicate with PC, connect IR link with the no.1 Bay.
8