User Manual
Z-KEY-P
ALL RIGHTS RESERVED. NO PART OF THIS PUBLICATION MAY
BE REPRODUCED WITHOUT PRIOR PERMISSION.
www.seneca.it
Doc: MI00572-1-EN
Page 43
First compile the project and log in to the PLC:
Now we have verified the correct functioning of the connection with the PLC.