background image

Quick Start Guide

DMG 4100/DMG 4200

In The Box

or

2RU or 1RU chassis with modules

Power cord

(1 x for single power

2 x for dual power)

Quick Start Guide

This guide is designed to aid the quick installation of your Sencore 

equipment. If you experience problems following these procedures or 

require further information regarding your head-end, refer to the User 
Manual.

Note: Illustrations in this guide may differ slightly from actual software.

Before Getting Started

Necessary materials and tools

• 

Ethernet cable

• 

Control port IP address

• 

Input and output cables

Unpacking and handling procedures

• 

Save the original packaging materials in case you need to return 

the equipment

• 

Health and safety: the equipment is heavy, observe occupational 

health and safety rules when handling

System requirements

• 

Rack size: 19”

• 

Height: 2RU or 1RU

• 

Ventilation: Ensure that there is enough space at the front and 

back of the unit

• 

Browsers: Mozilla Firefox, Microsoft Internet Explorer, Google 

Chrome

Technical Support

• 

Refer to your support agreement or contact Sencore’s support 

team

Warranty/Software Upgrades/Training

• 

Contact Sencore

•  Install the hardware
•  Connect the power supply(ies) to the power outlet using the cable(s) provided
•  On each power supply located at the back of the chassis, a green LED will indicate that the power is active

Getting Started

Reviews: