Rev1.1
10 of 30
www.semtech.com
SX1211SK868/915 User Guide
3.6
PING-PONG TEST PROCEDURE
The Ping Pong Settings flowchart is shown Figure 3.3. At the end of this process the Ping Pong test
will start automatically.
Figure 3.3: Ping-Pong Settings flowchart
Refer to paragraph 3.6.2
Ping Pong Test
Settings
Modulation and
Frequency band
Selection
Select the
modulation type
Select a Master and
a Slave
Power On the
boards
Ping Pong Test
Refer to paragraph 3.6.1
Refer to paragraph 3.6.3
Refer to paragraph 3.6.4
Refer to paragraph 3.6.5 and 3.6.5
TX LED is blinking
RX LED in On
Auto jump mode
Refer to paragraph 3.6.7
End Settings
Reset Master board
and Slave board