
4. The system will now test that the
Sensor Eye works as expected. The
Sensor-Eye LED will blink for about
10 seconds. After that, this LED will
light up constantly, indicating that
the test was successful.
5. The system will now find the GPS
position of the Main Unit. The GPS
LED blinks for about 40 seconds.
After that, this LED will light up
constantly, indicating that the GPS
location was found.
6. The last step is to establish a
connection to the Seluxit cloud. The
cloud LED will blink until the Main
Unit is connected. After that, this
LED will light up constantly,
indicating that the test was
successful.
SLX Heartbeat for Zoll AED Plus, Installation Guide (version 1.4, September 2020)
12 of 15
Summary of Contents for SLX Heartbeat
Page 1: ...Installation Guide...