Rapid 220 - Site Preparation Guide
Rapid 220 Site Preparation Guide
20
Receiving inspections
Note: The instructions below can be applied exclusively if the system is packaged in the crate used
for shipment.
The system and packaging shall be inspected immediately upon arrival at the plant. Possible damages or
unusual conditions shall be photographed and immediately notified, that is, within
less than one week
from arrival, in order for the client being entitled to claim transportation insurance. For this reason, it is
important to check and promptly notify to the carrier and to the provider, the existence of strokes/marks
due to negligent carriage and transportation.
If available, check on the crate:
Fig. 12 Rapid 220:
Example of shock-watch label (on crate)
If the shock-watch indicator has recorded and shows potentially damaging stresses suffered by a
package, the part depicted in picture 12 will change colors.