6
INSTALLATION INSTRUCTIONS
GENERAL
The installation section of this manual will provide all the necessary
information for room requirements, proper inspection, and installation.
Inspection
The equipment has been fully tested and inspected prior to shipment.
Although the unit has been packed in accordance with good commercial
practices, it does not preclude damage in transit.
The following actions should be taken on receipt of the equipment:
Visually inspect the shipping container for damage. If damaged,
request that the carrier inspect the shipment.
Unpack the inner container from the shipping container and remove
the unit from the packaging. Inspect the unit for visible damage.
If a claim for damages is to be made, it should be filed promptly with the
transportation company. In addition, notify SEI within two days of delivery.
SEI will advise the customer of any further procedures that may be
required, including an RMA number in the event that the unit has to be
returned to the factory for repair.
Make sure the following items are included inside the package:
One SEI DC-UPS Unit.
One AC Power Cord.
One warranty card.
One Installation and Operations Manual.