![SEH ISD300 Quick Installation Manual Download Page 9](http://html1.mh-extra.com/html/seh/isd300/isd300_quick-installation-manual_1233942009.webp)
Quick Installation Guide [en]
9
Switching the ISD300-PoE On/Off
Switching the Device On
The ISD300-PoE system software boots automatically if the device receives the
power it needs. The power supply can be started by plugging in the network cable
or by turning on the PoE device (device that is used to supply power to the
ISD300-PoE).
Switching the Device Off
Print jobs that are processed while the ISD shuts down cannot be completed.
Print jobs that are stored in a queue will be completed when the device reboots.
To turn off the device, shut down the system software manually.
Booting/Shutting down the System Software
The system software can be booted/shut down manually.
To boot the software, press the soft power switch for a
short moment.
To shut down the software, keep the soft power switch pressed for
five
seconds.
What Happens in the Case of a Power Failure?
When the ISD receives again the necessary power, it takes on the same status as
before the power failure.
Summary of Contents for ISD300
Page 17: ...Quick Installation Guide en 17...
Page 18: ...18 en Quick Installation Guide...
Page 33: ...Quick Installation Guide de 33...