Segway Personal Transporter SE Service Manual
9–6
Interconnect Board
Removal
1. Make sure the PT is powered off, unplugged, and the
batteries have been removed.
2. Establish a Serviceable Powerbase (
3. Remove the Radio Board (
4. Detach the Console from the Powerbase
5. Remove the Power Board (
).
6. Disconnect the two Pivot Assembly Harnesses. For
each harness, press down on the tab while gently
pulling the connector out of the socket.
7. Remove the Interconnect Board.
8. Using ESD best practices, place the Interconnect
Board in an ESD bag for return shipment to Segway.
Installation
1. Orient the Interconnect Board so the notched side
protrudes through the hole in the Console Base, and
the Pivot Harness connectors are toward the Pivot
Assembly. See
1. Install the Interconnect Board.
2. Connect the Pivot Harnesses to the Interconnect
Board.
3. Install the Power Board (
4. Install the Console onto the Powerbase
5. Install the Radio Board (
).
6. Reassemble the PT from the Serviceable Powerbase
).
7. Perform post-service tests (
).
Figure 9–7: Interconnect Board
Interconnect Board
Pivot Harnesses
Pivot Assembly
Console
Summary of Contents for i2 SE
Page 4: ...Segway Personal Transporter SE Service Manual iv...
Page 8: ...Segway Personal Transporter SE Service Manual viii Contents...
Page 28: ...Segway Personal Transporter SE Service Manual 3 4 Batteries...
Page 52: ...Segway Personal Transporter SE Service Manual 8 4 Serviceable Powerbase...
Page 66: ...Segway Personal Transporter SE Service Manual 10 4 Chassis Cover...
Page 70: ...Segway Personal Transporter SE Service Manual 11 4 CU Board...
Page 80: ...Segway Personal Transporter SE Service Manual A 2 Post Service Tests...
Page 88: ...Segway Personal Transporter SE Service Manual D 2 Tools and Equipment...
Page 90: ...Segway Personal Transporter SE Service Manual E 2 Glossary...
Page 91: ......
Page 92: ...24019 00001 aa...