
SEDONA ISlAND ASSEmbly INStructIONS
|
5
Using a manual or power Philips head screwdriver, remove
all of the screws used to secure the top cover of the crate.
Remove the island bottom, rear, front and two side panels
from within the crate.
SEDONA ISLAND ASSEMBLY INSTRUCTIONS
Step 1
DO NOT OMIT THIS STEP. If the base is not leveled
correctly the island will be misaligned. The base cannot be
leveled and the island cannot be moved once the assembly
is finished. If you need to reposition the island you will have
to disassemble it and start again.
Step 2
Position and level the Base
Unpacking the crate
We recommend 2 to 3 people perform
setup operations.
Place the island base on a level surface
in it’s final location and proceed to level
it in all directions. The bottom panel has
adjustable feet for this purpose.
TEAM
LIFT
FOR YOUR SAFETY
Island Base
Leveling Feet