SEDONA Sedona Island Assembly Instructions Manual Download Page 10

10

  

|

 

 

SEDONA ISlAND ASSEmbly INStructIONS

SEDONA ISLAND ASSEMBLY INSTRUCTIONS

We recommend a qualified, trained gas service technician 
perform all pipe fitting and gas leak test procedures prior to 
installing the refrigerator. Once installed there will be limited 
access to the gas piping. Before installing the side burner, 
familiarize yourself with the illustration on the next page.

Wrap the side burner manifold threads with Teflon tape, 
see Fig. 1 on page 11. Remove the 1/2” FIP fitting from 
the flexible hose and install it on the side burner manifold. 
Attach the stainless steel flexible hose to the 1/2” FIP fitting 
at the end of the side burner manifold.

Clear plastic replacement extension tubes are provided 
in the Open Me First box to drain spills and drain water 
from the side burner. Set the side burner in place in the 
counter top cutout. Be sure to keep the side burner wiring 
accessible to attach to the grill once it is installed. Route the 
tubes through the holes in the rear center of the island base 
for drainage out of the island.

On the bottom of the side burner locate the center Philips 
head screw on each side of the burner base. Remove the 
screw and install the side burner mounting bracket with it 
(Part No. 13, note weld nut position) flange up, as shown to 
the right. Screw the side burner mounting screw (Part No. 4) 
into the weld nut, and install the side burner mounting hex-
nut (Part No. 3) on the screw. Tighten the screw up to the 
side burner bracket frame to secure the side burner in place. 
Use the hex nut to lock the screw into position.

Step 9

Locate and remove the plug from the 1/2” Tee fitting in the 
grill manifold to facilitate the side burner connection (see 
the drawing on the next page).

With the help of an assistant set the grill in place. Make 
sure to align the grill evenly and be sure it is fully supported 
on the mounting flanges. Before sliding the grill back 
completely, reach behind the grill and attach the electrical 
wiring from the side burner using the attached Molex 
connectors (See page 13).

Step 10

Install the Grill

Install the Side Burner

Summary of Contents for Sedona Island

Page 1: ...Instructions MOM FRIENDLY DAD READY SEDONA Island Assembly...

Page 2: ...up The island must be installed and leveled in its final location Moving the island once complete is not advised as damage will occur SEDONA ISLAND ASSEMBLY INSTRUCTIONS Two to three people are needed...

Page 3: ...the grill be leveled properly in its final location The base has adjustable legs that must be used to level the island before the panels and top are installed Is the island installed on solid ground...

Page 4: ...OUNTING SCREW 1 4 20 X 1 1 4 PH 2 EA 5 14012 ACCESS DOOR FRAME MOUNTING SCREWS 1 4 20 X 3 8 PH 4 EA 6 14030 HEX BOLT 1 4 20 x 1 2 2 Ea 7 34264 TANK RETAINER FINGER SCREW 1 4 20 x 1 1 2 2 EA 8 34396 AD...

Page 5: ...ectly the island will be misaligned The base cannot be leveled and the island cannot be moved once the assembly is finished If you need to reposition the island you will have to disassemble it and sta...

Page 6: ...r SEDONA ISLAND ASSEMBLY INSTRUCTIONS Step 3 While one person holds the rear panel in place attach a side panel to the rear panel loosely using the 2 wing nuts Part No 9 turned in about 4 full turns T...

Page 7: ...aded mounting screws on the side panel Push the side panel into position and attach to the front panel loosely with 2 wing nuts Part No 9 Push the remaining side panel into position and attach it to t...

Page 8: ...on the right SEDONA ISLAND ASSEMBLY INSTRUCTIONS Step 5 Overview of the Island s Electrical System To prevent electrical shock use only a three pronged power cord do not remove the grounding prong do...

Page 9: ...d the other one down to release the drawer from the glides The access door simply lifts off of the hinge pins Place the storage system frame in the cutout and secure it with 4 access door frame mounti...

Page 10: ...d Route the tubes through the holes in the rear center of the island base for drainage out of the island On the bottom of the side burner locate the center Philips head screw on each side of the burne...

Page 11: ...side burner Remove the 1 2 fitting from the flexible hose and wrap the fitting with Teflon tape Install the fitting into the Tee fitting on the grill manifold then connect the flexible gas hose to th...

Page 12: ...to shake the solution Open the LP Cylinder and using a brush or spray bottle apply the solution to all fittings at the stainless steel connector the Tee fitting the regulator and hose connections Wait...

Page 13: ...DONA Island Assembly Instructions 13 Make the electrical connections as shown below then plug the transformer into the electrical outlet on the rear panel SEDONA ISLAND ASSEMBLY INSTRUCTIONS See Step...

Page 14: ...mitations on consequential damages This warranty gives you specific legal rights and you may have other rights which vary from state to state 7 No one has the authority to add to or vary Lynx s war ra...

Page 15: ...Sedona Islands 80764 1 Touch Up Kit L1600 L1500 Sandalwood 90216 1 Sedona Island Hardware Kit L1500G 34316 1 Top Panel L1500 Sedona Island Gray 34317 1 Front Panel L1500 Sedona Island Gray 34320 1 Si...

Page 16: ...nds 80762 1 Touch Up Kit L2600 L2500 Sandalwood 90216 1 Sedona Island Hardware Kit L2500G 34300 1 Top Panel L2500 Sedona Island Gray 34301 1 Front Panel L2500 Sedona Island Gray 34304 1 Side Panel Lef...

Page 17: ...SEDONA Island Assembly Instructions 17 notes...

Page 18: ...18 SEDONA Island Assembly Instructions notes...

Page 19: ......

Page 20: ...Lynx Professional Grills 5895 Rickenbacker Rd Commerce CA 90040 Service 888 Buy Lynx 888 289 5969 Fax 323 838 1778 www Lynxgrills com...

Reviews: