24
flashing under the upper shingles and on top of the lower shingles. Nail the flashing
to the roof, using roofing nails.
6.
Place the storm collar over the flashing, and tighten it with the bolt supplied. Finally,
seal the joint between the storm collar and the chimney, using silicone caulking.
7.
Install the chimney cap.
Figure 26
Figure 27
AC CHIMNEY INSTALLATION
(AIR COOLED GALVALUME CHIMNEY)
Summary of Contents for EPA BIS ULTRA
Page 2: ...Printed in Canada Rev 9 April 2007 PIBISULTRAEPA ...
Page 7: ...2 2 CERTIFICATION LABEL ...
Page 10: ...5 ...
Page 20: ...15 Figure 7 Figure 9 Figure 8 Figure 10 ...
Page 30: ...25 Figure 28 NOTE THE OUTSIDE AIR KIT IS MANDATORY FOR BOTH FIREPLACE AND CHIMNEY ...
Page 35: ...30 Figure 31 Figure 32 ...
Page 37: ...32 ...