Installation and commissioning
● Safely set up the TCC SMART heat press on a stable table.
● Position the controller box at the upper rear center of the base frame of the TCC SMART
heat press and let the threaded bolts at the controller box slide into the slots at the base
frame. Securely tighten the hand nuts.
● Attach the small 6-pin plug from the rear side of the base frame to the appropriate socket
on the outer right side of the controller box.
● Attach the large 5-pin plug from the surface of the heating element to the appropriate
socket on the right outer side of the controller box.
Secabo GmbH Hochstatt 6-8 85283 Wolnzach Germany [email protected] www.secabo.com
5