background image

H = h 
measur
ed 
“step 
103” – h 
engine 

  

step 64 

step 63 

5 min 

130 mm 

medium 

22 mm 

 

 

A = B 

 

Eletric engine version 

Eletric engine version 

Eletric engine version 

EPOXY 

20 min 

ELEVATOR 

CA  

Thin  

ELEVATOR 

C
A
  

T
h
i
n
  

CA 

Me

diu

m   

EPOXY 

20 min 

Summary of Contents for Aermacchi MB339 XS

Page 1: ...step 02 step 01 AILERON FLAP FLAP FOTO MANUAL MB339 XS 1 9m...

Page 2: ...step 04 step 03 20 min EPOXY FLAP Flap OIL...

Page 3: ...step 06 step 05 FLAP AILERON Epoxy 20 min...

Page 4: ...20 min EPOXY step 08 step 07 OIL AILERON AILERON...

Page 5: ...cut step 10 step 09 20 min EPOXY AILERON AILERON...

Page 6: ...AILERON FLAP step 12 step 11 cut FLAP cut...

Page 7: ...step 14 step 13 AILERON AILERON...

Page 8: ...step 16 step 15 AILERON AILERON...

Page 9: ...step 18 step 17 Flap Flap...

Page 10: ...step 20 step 19 Flap Flap...

Page 11: ...step 22 step 21 AILERON SERVO AILERON SERVO...

Page 12: ...step 24 step 23 AILERON SERVO AILERON SERVO...

Page 13: ...step 26 step 25 AILERON SERVO AILERON SERVO...

Page 14: ...step 28 step 27 AILERON SERVO FLAP SERVO...

Page 15: ...step 30 step 29 FLAP SERVO FLAP SERVO...

Page 16: ...step 32 step 31 FLAP SERVO FLAP SERVO...

Page 17: ...step 34 step 33 FLAP SERVO FLAP SERVO...

Page 18: ...step 36 step 35 L GEAR L GEAR step 36 SILCONE L GEAR...

Page 19: ...step 38 step 37 L GEAR L GEAR...

Page 20: ...step 40 step 39 CUT SPACE FOR THE BRAKE CABLE L GEAR L GEAR THIS SPACE ON BACK OF THE WHEEL IS NORMAL...

Page 21: ...step 43 step 42 L GEAR L GEAR...

Page 22: ...step 44 step 43 WING FANS ON BOTTOM WING FAN ON TOP CA MEDIUM CA MEDIUM...

Page 23: ...step 46 step 45 RUDDER WING FANS ON BOTTOM CA MEDIUM...

Page 24: ...step 48 step 47 RUDDER RUDDER EPOXY 20 min OIL...

Page 25: ...step 50 step 49 RUDDER RUDDER...

Page 26: ...step 52 step 51 RUDDER RUDDER...

Page 27: ...step 54 step 53 RUDDER CA Medium RUDDER...

Page 28: ...step 56 step 55 RUDDER RUDDER...

Page 29: ...step 58 step 57 RUDDER FIXING RUDDER FIXING...

Page 30: ...step 60 step 59 ALUMINUM TAPE RUDDER ELEVATOR CABLES RUDDER ELEVATOR CABLES...

Page 31: ...step 62 step 61 FUSELAGE FINS FUSELAGE FINS...

Page 32: ...step 64 step 63 EPOXY 20 min ELEVATOR ELEVATOR...

Page 33: ...step 66 step 65 ELEVATOR ELEVATOR EPOXY 20 min...

Page 34: ...step 68 step 67 ELEVATOR ELEVATOR...

Page 35: ...step 70 step 69 ELEVATOR ELEVATOR CA Medium...

Page 36: ...step 72 step 71 ELEVATOR FIXING ELEVATOR...

Page 37: ...step 74 step 73 ELEVATOR FIXING ELEVATOR FIXING...

Page 38: ...step 76 step 75 ELEVATOR FIXING ELEVATOR FIXING...

Page 39: ...step 78 step 77 ELEVATOR FIXING FRONT L GEAR...

Page 40: ...step 80 step 79 FRONT L GEAR FRONT L GEAR...

Page 41: ...step 82 step 81 FRONT L GEAR FRONT DOOR SERVO...

Page 42: ...step 84 step 83 FRONT DOOR SERVO FRONT DOOR SERVO...

Page 43: ...step 86 step 85 FRONT DOOR SERVO BATTERY SUPPORT...

Page 44: ...step 88 step 87 2 RX BATTERY SUPPORT TURBINE BATTERY SUPPORT...

Page 45: ...step 90 step 89 TRUST TUBE to buy as OPTION TURBINE INSTALLATION TURBINE INSTALLATION...

Page 46: ...step 92 step 91 TURBINE INSTALLATION TURBINE INSTALLATION...

Page 47: ...step 93 step 94 10 mm 25 mm SILICON TURBINE INSTALLATION TURBINE INSTALLATION...

Page 48: ...step 96 step 95 TURBINE INSTALLATION TURBINE INSTALLATION KERO TANK to buy as OPTION...

Page 49: ...step 98 step 97 Tank overflow TURBINE INSTALLATION TURBINE INSTALLATION...

Page 50: ...step 100 step 99 ECU electric L Gear Power Box Mercury SRS to buy as OPTION TURBINE INSTALLATION TURBINE INSTALLATION...

Page 51: ...step 102 step 101 COCKPIT COCKPIT...

Page 52: ...step 100 step 99 SILICON COCKPIT COCKPIT...

Page 53: ...step 102 step 101 WINGS FIXING CA Thin...

Page 54: ...step 104 step 103...

Page 55: ...step 106 Step 105...

Page 56: ...step 108 Step 107...

Page 57: ...step 110 Step 109...

Page 58: ...Step 111 160 170 mm NOTE Turbine version may need 250 300g of lead in the nose to glue with 5 min epoxy Step 112...

Reviews: