background image

H = h 
measur
ed 
“step 
103” – h 
engine 

  

cut  

step 40 

step 39 

5 min 

130 mm 

medium 

22 mm 

 

 

A = B 

 

tape  

CUT SPACE FOR 

THE BRAKE 

CABLE 

L.GEAR 

Eletric engine version 

Eletric engine version 

Lights 

L.GEAR 

THIS SPACE ON BACK OF 

THE WHEEL IS NORMAL 

Summary of Contents for Aermacchi MB339 XS

Page 1: ...step 02 step 01 AILERON FLAP FLAP FOTO MANUAL MB339 XS 1 9m...

Page 2: ...step 04 step 03 20 min EPOXY FLAP Flap OIL...

Page 3: ...step 06 step 05 FLAP AILERON Epoxy 20 min...

Page 4: ...20 min EPOXY step 08 step 07 OIL AILERON AILERON...

Page 5: ...cut step 10 step 09 20 min EPOXY AILERON AILERON...

Page 6: ...AILERON FLAP step 12 step 11 cut FLAP cut...

Page 7: ...step 14 step 13 AILERON AILERON...

Page 8: ...step 16 step 15 AILERON AILERON...

Page 9: ...step 18 step 17 Flap Flap...

Page 10: ...step 20 step 19 Flap Flap...

Page 11: ...step 22 step 21 AILERON SERVO AILERON SERVO...

Page 12: ...step 24 step 23 AILERON SERVO AILERON SERVO...

Page 13: ...step 26 step 25 AILERON SERVO AILERON SERVO...

Page 14: ...step 28 step 27 AILERON SERVO FLAP SERVO...

Page 15: ...step 30 step 29 FLAP SERVO FLAP SERVO...

Page 16: ...step 32 step 31 FLAP SERVO FLAP SERVO...

Page 17: ...step 34 step 33 FLAP SERVO FLAP SERVO...

Page 18: ...step 36 step 35 L GEAR L GEAR step 36 SILCONE L GEAR...

Page 19: ...step 38 step 37 L GEAR L GEAR...

Page 20: ...step 40 step 39 CUT SPACE FOR THE BRAKE CABLE L GEAR L GEAR THIS SPACE ON BACK OF THE WHEEL IS NORMAL...

Page 21: ...step 43 step 42 L GEAR L GEAR...

Page 22: ...step 44 step 43 WING FANS ON BOTTOM WING FAN ON TOP CA MEDIUM CA MEDIUM...

Page 23: ...step 46 step 45 RUDDER WING FANS ON BOTTOM CA MEDIUM...

Page 24: ...step 48 step 47 RUDDER RUDDER EPOXY 20 min OIL...

Page 25: ...step 50 step 49 RUDDER RUDDER...

Page 26: ...step 52 step 51 RUDDER RUDDER...

Page 27: ...step 54 step 53 RUDDER CA Medium RUDDER...

Page 28: ...step 56 step 55 RUDDER RUDDER...

Page 29: ...step 58 step 57 RUDDER FIXING RUDDER FIXING...

Page 30: ...step 60 step 59 ALUMINUM TAPE RUDDER ELEVATOR CABLES RUDDER ELEVATOR CABLES...

Page 31: ...step 62 step 61 FUSELAGE FINS FUSELAGE FINS...

Page 32: ...step 64 step 63 EPOXY 20 min ELEVATOR ELEVATOR...

Page 33: ...step 66 step 65 ELEVATOR ELEVATOR EPOXY 20 min...

Page 34: ...step 68 step 67 ELEVATOR ELEVATOR...

Page 35: ...step 70 step 69 ELEVATOR ELEVATOR CA Medium...

Page 36: ...step 72 step 71 ELEVATOR FIXING ELEVATOR...

Page 37: ...step 74 step 73 ELEVATOR FIXING ELEVATOR FIXING...

Page 38: ...step 76 step 75 ELEVATOR FIXING ELEVATOR FIXING...

Page 39: ...step 78 step 77 ELEVATOR FIXING FRONT L GEAR...

Page 40: ...step 80 step 79 FRONT L GEAR FRONT L GEAR...

Page 41: ...step 82 step 81 FRONT L GEAR FRONT DOOR SERVO...

Page 42: ...step 84 step 83 FRONT DOOR SERVO FRONT DOOR SERVO...

Page 43: ...step 86 step 85 FRONT DOOR SERVO BATTERY SUPPORT...

Page 44: ...step 88 step 87 2 RX BATTERY SUPPORT TURBINE BATTERY SUPPORT...

Page 45: ...step 90 step 89 TRUST TUBE to buy as OPTION TURBINE INSTALLATION TURBINE INSTALLATION...

Page 46: ...step 92 step 91 TURBINE INSTALLATION TURBINE INSTALLATION...

Page 47: ...step 93 step 94 10 mm 25 mm SILICON TURBINE INSTALLATION TURBINE INSTALLATION...

Page 48: ...step 96 step 95 TURBINE INSTALLATION TURBINE INSTALLATION KERO TANK to buy as OPTION...

Page 49: ...step 98 step 97 Tank overflow TURBINE INSTALLATION TURBINE INSTALLATION...

Page 50: ...step 100 step 99 ECU electric L Gear Power Box Mercury SRS to buy as OPTION TURBINE INSTALLATION TURBINE INSTALLATION...

Page 51: ...step 102 step 101 COCKPIT COCKPIT...

Page 52: ...step 100 step 99 SILICON COCKPIT COCKPIT...

Page 53: ...step 102 step 101 WINGS FIXING CA Thin...

Page 54: ...step 104 step 103...

Page 55: ...step 106 Step 105...

Page 56: ...step 108 Step 107...

Page 57: ...step 110 Step 109...

Page 58: ...Step 111 160 170 mm NOTE Turbine version may need 250 300g of lead in the nose to glue with 5 min epoxy Step 112...

Reviews: