12
concrete anchors (not provided).
HARDWARE:
Option A WALL INSTALLATION
2.1A Center the bracket on the vertical centerline with the bottom edge of the bracket on the horizontal line as shown (with the
arrow pointing toward the ceiling).
2.2A Mark the holes. Drill 3/16" pilot holes and fasten the bracket securely to a structural support with the hardware provided.
Option B CEILING INSTALLATION
2.1B Extend the vertical centerline onto the ceiling as shown.
2.2B Center the bracket on the vertical mark, no more than 6" (15 cm) from the wall. Make sure the arrow is pointing away
from the wall. The bracket can be mounted flush against the ceiling when clearance is minimal.
2.3B Mark the holes. Drill 3/16" pilot holes and fasten bracket securely to a structural support with the hardware provided.
INSTALLATION
3
、
Attach the Rail to the Header Bracket
3.1 Align the rail with the header bracket. Insert the clevis pin (H1) through the holes in the header racket and rail. Secure
with the cottor (H5).
H7
H7
H7 Lag Screw M8×40 (2)
H1
Clevis Pin, long
Φ
8×80 (1)
H5
Cotter
Φ
2×25(1)