-21-
COMPONENTS
TEST PROCEDURE
RESULTS
RELAY 2
FAN MOTOR
(Wire leads removed)
TURNTABLE
MOTOR
(Wire leads removed)
SENSOR
Check for continuity of relay 2 with an ohm-
meter.
(Remove wire leads from relay 2 and operate
the unit.)
Measure the resistance.
(Ohm-meter scale: R x 1)
Measure the resistance.
(Ohm-meter scale: R x 1)
1) Disconnect sensor connector from micom
computer board.
2) Measure resistance terminal to terminal
(ohm meter scale: R X 1000)
POWER
LEVEL
1
4 sec
18 sec
2
6 sec
16 sec
3
8 sec
14 sec
4
10 sec
12 sec
5
12 sec
10 sec
6
14 sec
8 sec
7
16 sec
6 sec
8
18 sec
4 sec
9
20 sec
2 sec
10
22 sec
0 sec
Normal:
A: Approx. 85 ~ 100 ohm.
B: Approx. 10 ~ 25 ohm.
Abnormal: Infinite or several
ohm.
Normal: Approx.100~150 ohm
Abnormal: Infinite or several
ohm.
Normal: Approximately
BK - RD: 5.2 Kohm
RD - WH: 2.1 Kohm
BK - WH: 2.1 Kohm
Abnormal: Infinite or several.
* Sensor cooking condition
1. Oven should be plugged in at least
5 minutes before sensor cooking.
2. Room temperature should not
exceed 95°F .
3. Be sure the exterior of the cooking
container and the interior of the oven
are dry. Wipe each off with paper
towel.
4. The oven will not generate
microwave energy for the first 28
seconds of the sensor cooking cycle.
NOTE : • A MICROWAVE LEAKAGE TEST MUST ALWAYS BE PERFORMED
WHEN THE UNIT IS SERVICED FOR ANY REASON.
• MAKE SURE THE WIRE LEADS ARE IN THE CORRECT POSITION.
• WHEN REMOVING THE WIRE LEADS FROM THE PARTS, BE SURE
TO GRASP THE CONNECTOR, NOT THE WIRES.
Relay 2
A
B
RD
BK
WH
1
2
3
Summary of Contents for 721.66339
Page 9: ...B MATRIX CIRCUIT FOR TOUCH KEY BOARD 8 Figure 4...
Page 32: ...31 DOOR PARTS 1004 1000 1005 1007 1006 1002 1013 1003 1001 EV...
Page 33: ...32 CONTROLLER PARTS 2000 2002 2006 W106 2004 2381 EV...
Page 34: ...33 OVEN CAVITY PARTS 3002 W107 W103 3001 3003 3008 3009 W105 3034 EV...
Page 35: ...34 LATCH BOARD PARTS W102 4002 4003 4002 4004 4000 4001 EV...
Page 37: ...36 BASE PLATE PARTS 5008 W101 W108 6000 6007 6001 EV...