FLOW RAnGE, InSTALLATIOn

Step 1.

Position gasket 
at either end

Step 2.

Place adapter 
against gasket, 
open screw clamps 
to clear flanges

Step 3.

Place screw-clamps 
over both adapter 
and meter flanges 
and tighten screws

InSTALLATIOn

Piping  Conditions.

    Installing  the  meter  with  a  length  of 

straight pipe at least two times the diameter upstream and 

one diameters downstream is highly recommended. Some 

piping conditions require more than this. See chart for rec-

ommendations.

End  Connections.

  The  meter  comes  with  Banjo™  union-

type flange connections for ease in servicing the meter. To 

connect these to piping ends, a variety of kits are available 

from any Banjo dealer or from Seametrics.

Follow the diagram below to make the connections.

Position.

  This is an all position meter which can be installed either vertically or horizontally, register up, down or angled. 

However, entrained air or solids may make some positions preferable to others. See the position diagram for guidance.

Elbows

Less Ideal:

Air bubbles and sediment on the

electrodes can affect accuracy

Intermittent air

bubbles

pass over
electrode

Possible 

sediment 

build-up

Recommended:

May prevent sediment

or bubble problems

Electrode 

moved from 

top by rotating 

meter

Intermittent air

bubbles

miss electrode

Electrodes free 

from sediment 

build-up

WMP

WMP

3

FLOW RAnGE

 

1” 

2”

 

Gal/Min 

Liter/Sec 

Gal/Min 

Liter/Sec

 

2.3 

.095 

.375

 

110 

4.73 

300 

18.9

Minimum

Maximum

nOTE:

  Above installation instructions are for WMP101/104-200 (2”) only. The WMP101/104-100 (1”) is provided with 

intergrated NPT female threaded ends.

Summary of Contents for WMP-Series

Page 1: ...WMP Series PLASTIC BODIED MAGMETER instructions W M P S eries P L A S T I C B O D I E D M A G M E T E R i n str u ctio n s 2 inch 1 inch ...

Page 2: ...Flow rate and total can be displayed in a variety of units customer selected and factory set The WMP Series is used for tracking flow rate and total flow in usage monitoring applications for instance in compliance with regulatory requirements These would include wells industrial wastewater heap leach mining discharge cooling tower deduct metering turf and landscape applications and other water rec...

Page 3: ...unregulated power supply 18 Vdc may damage the meter due to AC line input voltage fluctuation 6 each AA alkaline cells replaceable Estimated life is 1 year with meter in typical use or 3 years dry 2 each C lithium batteries replaceable Estimated life is 3 years with meter in typical use or 10 years dry Current sinking pulse opto isolated 24 Vdc at 10 mA max 1 gal pulse out or 1 liter pulse out dep...

Page 4: ...eametrics Follow the diagram below to make the connections Position This is an all position meter which can be installed either vertically or horizontally register up down or angled However entrained air or solids may make some positions preferable to others See the position diagram for guidance Less Ideal Air bubbles and sediment on the electrodes can affect accuracy Intermittent air bubbles pass...

Page 5: ...deal Air can be trapped Not Ideal Post valve cavitation can create air pocket Recommended Allows air to bleed off Recommended Keep pipe full at meter for accuracy Recommended Keeps pipe full at meter for accuracy WMP WMP WMP WMP WMP WMP 1X 5X 5X Expanded Pipe Swirling Flow Partially Open Butterfly Valve 1X WMP WMP Reduced Pipe 4 ...

Page 6: ...the display Then connect the pulse output Operation Grounding WMP101 For best performance especially in chemically noisy environments the gray ground wire and the bare drain wire should be connected together and to a good earth ground as close to the meter as possible Metal pipe and fittings in contact with the fluid should also be bonded to the same earth ground with corrosion resis tant connecti...

Page 7: ... in place Be care ful not to lose the wash ers Move the top cover to one side and remove the foam retainer which covers the battery tray or pack For units with AA alkaline batteries remove the old bat teries from the battery tray and replace them with fresh ones taking care to fol low the polarity indicators in the battery tray For units with C lithium batteries carefully unplug each of the two ba...

Page 8: ...LT 65200337 B 4 12 10 Seametrics Incorporated 19026 72nd Avenue South Kent Washington 98032 USA P 253 872 0284 F 253 872 0285 1 800 975 8153 www seametrics com ...

Reviews: