background image

TRIDENT-3000

 

3000mm dia. Ocean Buoy 

Installation & Service Manual

 

Version 1.

6

 

Summary of Contents for SL-B3000Q

Page 1: ...TRIDENT 3000 3000mm dia Ocean Buoy Installation Service Manual Version 1 6 ...

Page 2: ...e 7 Assembly Instructions Page 9 Mooring Diagram Page 14 Standard Wiring Diagram Page 15 GSM Wiring Diagram Page 16 Marine Buoy Maintenance Page 17 Sealite Buoy Warranty Page 19 Version No Description Date Approved 1 0 Manual Launch Nov 2009 A Dixon 1 1 Addition of 5 1m Trident June 2010 M Henry 1 2 Technical Drawings Warranty Updated July 2010 K Paton 1 3 Update Spec table June 2012 J Dore 1 4 Up...

Page 3: ...navigation The Sealite buoy division provides turn key production of navigation buoys From tooling development raw materials selection and production to final testing and inspection Sealite guarantees superior quality and fast turn around times Sealite s buoy products are available in a wide range of configurations and sizes and can be economically shipped worldwide No painting Inhibits growth Inc...

Page 4: ...eristics Material WallThickness mm inches Ballast kg lbs Rotationally moulded UV stabilized virgin polyethylene float section top marks and panelling 316 grade stainless steel tower assembly 16 5 8 680 1500 external steel Filling Closed cell polyurethane foam float section Height mm inches 8500 3341 2 Width mm inches 3000 1181 8 Mass kg lbs 2385 5258 depending onpayload RadarReflector 6000 13228 o...

Page 5: ...le at www sealite com 6 SL C310 Compact Solar Marine Lantern SL C420 Compact Solar Marine Lantern SL 125 Series LED Marine Lantern Series SL 155 Marine Lanterns Mould in graphics Monitoring Systems AIS GSMCell Phone TRIDENT 3000 Lantern Options TRIDENT 3000 Accessory Options ...

Page 6: ...at Washer 64 Ø16 S S Spring Washer 40 M16 Nut 48 M16mm Tie Rods 4 Float Straps 4 Tie Rods 4 Ballast Plates Rubber Collar Insulator 1 Rubber Ballast Mounting Squares 4 Ballast Rods 4 M20 Nuts 8 Ø20 Flat Washer 8 Ø20 Spring Washer 8 Mooring Pin 1 Mooring Pin Sleeve 1 M48 Nut 1 M10 x 30mm Long Bolt 1 Ø10 Spring Washer 1 Varies depending on local conditions and installation requirements TRIDENT 3000 P...

Page 7: ...r 16 M12 Nut 16 M10 x 25mm Long Bolts 12 M10 x 45mm Long Bolts 4 Ø10 Penny Washer 60 Ø10 Spring Washer 30 M10 Nut 30 12V 55AH SLA Battery 1 M10 x 110mm Long Bolts 14 4 5 mtr Tower Assembly with 1 Ladder Description Qty Tower Assembly complete with 1 Ladder Assembly and Solar Panels attached 1 Top Mark 1 M8 x 25mm Long Socket Head Cap Screws 4 Ø8 Penny Washer 8 Ø8 Spring Washer 4 M8 Nuts 4 Day Mark...

Page 8: ...our Float sections are secured around the mooring post Secure 8 x bolts down each joint on the Float Sections Leave the Mooring post and Float to settle for 4 hours or overnight before tightening each bolt a second time Giving the buoy time to relax in the fitted position will create a better joint Step 4 Only required if you have purchased the SLB3000 Strap Kit This Kit includes all parts require...

Page 9: ...ash codes intensity and troubleshooting Step 9 Position and secure the top mark to the Tower Assembly using 4 x M8 Socket Head Cap Screws Flat and Spring Washers and Nuts Step 10 Lift and secure the Tower Assembly onto the Mooring Post The Tower Assembly MUST be positioned with the ladder and Hatch located on a corner of the Mooring Post between the Lifting Eyes Secure the Tower to the Mooring Pos...

Page 10: ...ts Nuts Flat and Spring Washers are secured correctly Step 14 Lift the Buoy ONLY using the Lifting Eyes on the Mooring Post Position the Rubber Collar Insulator around the base of the mooring post Secure it in position Position 4 x Rubber Ballast Mounting Squares on each leg of the Mooring Post Fit the 2 x Ballast Plates on to the base of the Mooring Post Position a second set of 2 x Ballast plate...

Page 11: ...atest products and information available at www sealite com 12 Diagram 1 4 5 mtr TRIDENT 3000 Day Marks fit over locating posts here Secure to base of Tower Assembly Ladder Mounting Plate Rubber Collar Insulator Ballast Plates Mooring Pin ...

Page 12: ...atest products and information available at www sealite com 13 Diagram 2 5 1 mtr TRIDENT 3000 Day Marks fit over locating posts here Secure to base of Tower Assembly Ladder Mounting Plate Rubber Collar Insulator Ballast Plates Mooring Pin ...

Page 13: ...TRIDENT 3000 3000mm dia Ocean Buoy Latest products and information available at www sealite com 14 TRIDENT 3000 Mooring Diagram ...

Page 14: ...TRIDENT 3000 3000mm dia Ocean Buoy Latest products and information available at www sealite com 15 Standard Wiring Diagram ...

Page 15: ...TRIDENT 3000 3000mm dia Ocean Buoy Latest products and information available at www sealite com 16 GSM Wiring Diagram ...

Page 16: ...animaldebris Mooring Annual Maintenance Check and clear the tail and ride chains from shells andalgae Check for wear on any swivel and shackle axis and check the tapered pins on the mooring pin Any worn swivels and shackles must be replaced Check the free movement of each swivel around its head If any swivel head sticks it must be replaced Check every link of the thrash length of the chain Check t...

Page 17: ...TRIDENT 3000 3000mm dia Ocean Buoy Latest products and information available at www sealite com 18 Notes ...

Page 18: ...st be accompanied by a written description of the defect and a photocopy of the original purchase receipt This receipt must clearly list model and serial number the date of purchase the name and address of the purchaser and authorised dealer and the price paid by the purchaser On receipt of the product Sealite Pty Ltd will assess the product and advise the customer as to whether the claimed defect...

Page 19: ...ns 1 19NM Bridge Barge Lights Marine Buoys up to 3mt in diameter Mooring Systems Accessories Head Office Sealite Pty Ltd 11 Industrial Drive Somerville Vic 3912 Australia Tel 61 3 5977 6128 Fax 61 3 5977 6124 Email info sealite com Internet www sealite com Other Sealite Products Available Area Lighting ng Control Systems ...

Reviews: