background image

Quickstart Guide

AV-OL

-75

Sealite Asia Pte Ltd

Singapore

t: +65 6829 2243

Sealite USA LLC 

USA

t: +1 (603) 737 1311

Sealite Pty Ltd

Australia

t: +61 (0)3 5977 6128

We believe technology improves navigation™

info@

av

lite.com

 

av

lite.com

Charging the Battery

New l

ight

 should be left in the sun for 1-2 days to ensure battery is charged before placing in 

service. Please note, l

ight

 will re-charge even when switch is turned to ‘OFF’ position.

 

Preferred Installation Location

For best l

ight

 performance, ensure solar modules are not covered and are in clear view of the 

sky with no shadows.

4

5

6 7

8 9 A

B

C

D

EF0

12

3

4

5

6 7

8 9 A

B

C

D

EF0

12

3

A

B

ON

OFF

Rotary 

Switch A

Rotary 

Switch B

Intensity Setting

ON / OFF 

Switch

User

Replaceable

Battery

L

ight

Base

Diagram 1.

Reviews: