GSS1515.V2, GSS1515G.V2 Issue: 2(I) - 13/04/17
Original Language Version
© Jack Sealey Limited
Garden
Shed
1.5 x 1.5 x 2.1m
42
20D
20E
41B
4B
41A
33R
23
Step 5:
Assemble the front wall panel
Place part 4B (sheet) on the worktable. Fit part 20D (top channel), part 20E (bottom channel) and part 41B (jamb) (There are pre-drilled
holes for the next step on both parts 4B and 41B that must be aligned) and part 33R (mid wall channel) to the sheeting and fix them
with the self-tapping screws.
NOTE:
All screws marked with a cross should not be fixed at this stage. Make sure that the small lips on
channels 20D and 20E are always facing out. This ensures rainwater cannot build up inside your shed.
Fit part 41A (jamb), part 42 (jamb) and part 23 (bottom channel) and fix them with the self tapping screws (except those
marked with a cross). Make sure both joins (diagrams A and B) are fixed the same followed by diagrams C and D.
RIDGES FACING UP
Note:
Small lip on
channels 20D &
20E should always
be facing out.
Note:
Channel 33R
should face down.
C
A
B
D
ROOF TOP EDGE