background image

4.4 See fig.3. 

continue to assemble the next two pairs of cross  

 

beams at the heights required. the end frames allow adjustment  

 

in 3" increments. Each pair of beams must be mounted at the  

 

same height. Ensure that all tabs on the cross beam brackets are  

 

fully engaged in the slots in the uprights and that the cross  

 

beams are properly tapped down into place.

4.5

 

See fig.4.

 Assemble the remaining two cross beams to the top  

 

of the frame as shown below ensuring that the tabs are fully  

 

engaged into the end frames.

4.6

 

See fig.5.

 Each wire deck 'c' is reinforced with four cross  

 

members welded onto the underside of the mesh. Each of these  

 

cross members has a turned down tab at either end that must  

 

pass through slots in the cross beams. Place a wire deck onto  

 

each pair of cross beams as shown below ensuring that it sits  

 

into the recessed section on the top surface of each cross beam  

 

and all tabs pass through the slots in the cross beams  as shown  

 

in the inset diagram at the bottom of fig.5.

4.7

 

See fig.6.

 Extra components are available to create extra  

 

storage bays as required (see section 3). In the example below a  

 

third storage bay is achieved by joining two free standing units . 

 

fig.5

fig.3

fig.4

fig.6

  AP6572E     IssuE no:2 04/11/08

01284 757500

01284 703534

[email protected]

Sole Uk Distributor

Sealey group,

Bury st. Edmunds, suffolk.

www.sealey.co.uk

Web

email

NOTE:

 

It is our policy to continually improve products and as such we reserve the right to alter data, specifications and component parts without prior notice.

iMpORTanT: 

no liability is accepted for incorrect use of this product. 

WaRRanTy: 

Guarantee is 12 months from purchase date, proof of which will be required for any claim. 

infORMaTiOn: 

for a copy of our catalogue and latest promotions call us on 01284 757525 and leave your full name, address and postcode.

Reviews: