background image

10

5.5   Attach the extension posts to the back two uprights and assemble and mount the top shelf frame as shown in diagram 9.

5.6  Attach the peg board and position the top shelf, work top and bottom shelf as indicated in diagram 10.

5.7  Attach tool hooks to peg board as required. See diagram 10.

9

sealey Group, kempson Way, suffolk Business Park, Bury st edmunds, suffolk. iP32 7ar

 01284 757500 

 01284 703534 

 [email protected] 

 www.sealey.co.uk

enVironment Protection

Recycle unwanted materials instead of disposing of them as waste. All tools, accessories and packaging should be sorted, taken to 
a recycling centre and disposed of in a manner which is compatible with the environment. When the product becomes completely 
unserviceable and requires disposal, drain any fluids (if applicable) into approved containers and dispose of the product and fluids 
according to local regulations.

note

: It is our policy to continually improve products and as such we reserve the right to alter data, specifications and component parts without prior 

notice.

important

: no liability is accepted for incorrect use of this product.

Warranty

: Guarantee is 12 months from purchase date, proof of which is required for any claim.

AP12600.V4 Issue 2 06/02/19

Original Language Version

© Jack Sealey limited

Reviews: