Sealey AK4563D Instructions Download Page 4

NOTE: It is our policy to continually improve products and as such we reserve the right to alter data, specifications and component parts without prior notice.

IMPORTANT: 

no liability is accepted for incorrect use of product. 

WARRANTY: 

Guarantee is 12 months from purchase date, proof of which will be required for any claim. 

INFORMATION: 

call us for a copy of our latest catalogue on 01284 757525 and leave your full name and address including your postcode.

01284 757500

[email protected]

www.sealey.co.uk

01284 703534

Sole U.K. Distributor 

sealey Group

Bury St. Edmunds 

Suffolk.

Web

  6.  DeClARATION OF CONFORmITy

Declaration of Conformity 

We, the sole importer into the UK, declare that the product listed below is in conformity with the following 

standards and directives

The construction file for this product is held by the Manufacturer and may be inspected on 

request by contacting Jack Sealey Ltd.

For Jack Sealey Ltd. Sole importer into the UK of Sealey Power Products.

Oil Dispensing System 

Air Operated

Model: AK4563D

2002/95/Ec RoHS Directive

2002/96/EEc WEEE Directive

14th november 2008

Signed by Steve Buckle

AK4563D

Issue no: 1 - 14/11/08

fig.9

  5.  mAINTeNANCe

5.1 

Changing the Digital Meter Battery

5.1.1  Remove the rubber protective cover from the meter.

5.1.2  Remove the screw and cover from the side of the meter.

5.1.3  Remove and replace battery (fig.8).

5.1.4  Replace cover and secure with screw.

5.1.5  Replace the protective rubber cover.

Note:

  If the LcD display does not activate, remove the meter as in section 4.6.1, press  

 

button 1 (fig.7.1) to reboot the meter.

5.2

 

Before every use visually check the supply hose for damage and check all joints  

 

for leaks, any damaged component must be replaced or leaks repaired before  

 

using.

5.3

 

check the nozzle valve for leaks, if it does not seal, replace before using.

5.4

 

Drain air regulator water trap daily.

5.5

 

Top up lubricator as required, using a quality air tool oil.

5.6

 

To change the silencer, remove the circlip (fig.9) and remove the old  

 

 

silencer, place a new silencer into the recess and refit the circlip.

Note:

  For any other maintenance and repairs the unit should be returned to your 

 

Sealey dealer.

fig.8

Summary of Contents for AK4563D

Page 1: ... NOT leave the trolley on a slope or traverse slopes which may cause the unit to topple The unit must be stored on a level surface Keep the pump clean and store in a safe dry childproof location WARNING DO NOT allow uncontrolled discharge of fluids thus polluting the environment All liquids must be disposed of according to local authority regulations Instructions for Oil dispensing system air oper...

Page 2: ...he base plate until it bottoms out on the stops and secure with the hex grub screw 1 3 2 Pump and Air Regulator Lubricator Assembly 3 2 1 Apply a small amount of liquid thread sealant onto the threads of the air inlet of the pump and attach the air regulator lubricator fig 2 WARNING DO NOT allow thread sealant to enter the pump 3 2 2 Attach the outlet pipe to the male outlet thread on the pump and...

Page 3: ...ter display Press the Move Reset buttons fig 5 1 and fig 5 2 simultaneously to display the current correction factor Qty Dispensed Qty Indicated x Current Correction Factor New Correction Factor 4 6 Programming the Correction Factor 4 6 1 Remove the rubber protective cover from the meter and unscrew the four phillips screws fig 6 holding the digital meter remove from the gun 4 6 2 Press button 2 o...

Page 4: ...pensing System Air Operated Model AK4563D 2002 95 EC RoHS Directive 2002 96 EEC WEEE Directive 14th November 2008 Signed by Steve Buckle AK4563D Issue No 1 14 11 08 fig 9 5 Maintenance 5 1 Changing the Digital Meter Battery 5 1 1 Remove the rubber protective cover from the meter 5 1 2 Remove the screw and cover from the side of the meter 5 1 3 Remove and replace battery fig 8 5 1 4 Replace cover a...

Reviews: