©Sealevel Systems, Inc.
HazPAC R9-8.4 User Installation Guide
7
SL9258 8/2015
INSTALLATION INSTRUCTIONS
•
Place the HazPAC R9 in position; the twelve studs go through the twelve holes on the panel mounting plate
(see figures below).
•
Place the supplied 6/32" KEPS nuts on each of the twelve mounting studs. Fasten only hand tight.
•
After the display is properly positioned, tighten the nuts to 0.56 Nm (5 in lb) of torque in the sequence
pictured below. Do not overtighten. Repeat the sequence to ensure proper torque values are retained.
HazPAC R9-8.4
HazPAC R9-8.4
HazPAC R9-8.4