www.seagullmodels.com
13
Because of the size of the cowl, it may be nec-
essary to use a needle valve extension for the
high speed needle valve. Make this out of suf-
ficient length 1.5mm wire and install it into the
end of the needle valve. Secure the wire in
place by tightening the set screw in the side of
the needle valve.
Trim and cut.
COWLING INSTALLATION.
Trim and cut.
8) Reinstall the servo horn by sliding the
connector over the pushrod wire. Center the
throttle stick and trim and install the servo horn
perpendicular to the servo center line.
9) Move the throttle stick to the closed position
and move the carburetor to closed. Use a 2.5mm
hex wrench to tighten the screw that secures
the throttle pushrod wire. Make sure to use
threadlock on the screw so it does not vibrate
loose.
1) Slide the fiberglass cowl over the
engine and line up the back edge of the cowl
with the marks you made on the fuselage then
trim and cut as shown.
3) Install the muffler and muffler extension
onto the engine and make the cut out in the
cowl for muffler clearance. Connect the fuel
and pressure lines to the carburetor, muffler
and fuel filler valve. Secure the cowl to fuse-
lage using the M3x10mm screws .
2) While keeping the back edge of the
cowl flush with the marks, align the front of
the cowl with the crankshaft of the engine. The
front of the cowl should be positioned so the
crankshaft is in nearly the middle of the cowl
opening. Use the spinner backplate as a guide.
Hold the cowl firmly in place using pieces of
masking tape.
Machine Screw M3x10mm
.
Needle valve.