![Seagull Models P-26A PEASHOOTER Assembly Manual Download Page 15](http://html.mh-extra.com/html/seagull-models/p-26a-peashooter/p-26a-peashooter_assembly-manual_1223418015.webp)
15
.
Trim and cut.
3/32” Hole.
INSTALLING THE STOPPER
ASSEMBLY.
1) Using a modeling knife, carefully cut
off the rear portion of one of the 3 nylon
tubes leaving 1/2” protruding from the
rear of the stopper. This will be the fuel
pick up tube.
2) Using a modeling knife, cut one length
of silicon fuel line. Connect one end of
the line to the weighted fuel pick up and
the other end to the nylon pick up tube.
.
Switch.
INSTALLING THE ENGINE SWITCH.
Trim and cut.
Switch.
Vent tube.
Fuel fill tube.
Fuel pick up tube.
3) Carefully bend the second tube up at a 45º
angle. This tube is the vent tube.
Summary of Contents for P-26A PEASHOOTER
Page 8: ...P 26A Peashooter Instruction Manual 8 TOP VIEW BOTTOM VIEW Epoxy Epoxy Epoxy ...
Page 9: ...9 INSTALLING THE MAIN LANDING GEAR Epoxy ...
Page 10: ...P 26A Peashooter Instruction Manual 10 2mm 3x15mm Fill Epoxy C A glue ...
Page 13: ...13 Collar Collar Collar ...
Page 18: ...P 26A Peashooter Instruction Manual 18 M5x90mm Use thread locker glue for each blind nut ...
Page 20: ...P 26A Peashooter Instruction Manual 20 DUMMY ENGINE ...
Page 21: ...21 COWLING Epoxy M3x15mm ...
Page 32: ...P 26A Peashooter Instruction Manual 32 ...
Page 33: ...33 BOTTOM VIEW ...